Agentic AI · Module 1 reference
Glossary
Short definitions as the module uses them, each linked to the lesson it comes from.
- The thinking layer
The part of the work that stays yours: how you think about an assistant and how you brief it. The notes say it outlasts any particular tool.
Review Lesson 1- Large language model (LLM)
A model that builds an answer one word at a time by predicting what comes next, rather than looking anything up.
Review Lesson 2- Hallucination
Being confidently wrong. It is why names, numbers, dates and quotes need verifying.
Review Lesson 2- Training cutoff
The point where the model's knowledge stops, so it may not know recent events.
Review Lesson 2- Context window
The model's limited memory: what is in front of it. The notes picture a desk, where anything pushed off the edge is ignored.
Review Lesson 2- Compose, not retrieve
The model writes a fresh answer instead of fetching a stored one. It is not a search engine.
Review Lesson 2- The “trust an intern?” test
Would you hand this task to a smart, brand-new intern unsupervised? Yes means let AI help and review; no means keep a human in the loop.
Review Lesson 3- AI drafts, humans decide
The golden rule on Card 2: accountability for the result never transfers to the tool.
Review Lesson 3- The giant, vague ask
A huge unspecified request such as “build me a marketing strategy”. Vague in, generic out.
Review Lesson 4- One task, one job
Each step does a single thing, so it is easy to do and easy to check.
Review Lesson 4- Chaining
Feeding each step's output into the next step.
Review Lesson 4- Context engineering
Giving the assistant the right briefing, on purpose and done well.
Review Lesson 5- Context rot
What happens when too much text is pasted in: the model loses the key piece.
Review Lesson 5- Signal, not volume
The smallest set of high-signal information that does the job.
Review Lesson 5- The five ingredients
Role, goal, audience, format and constraints, and examples and materials.
Review Lesson 5- Prompt anatomy
The parts of a written prompt: role, task, audience, format and example.
Review Lesson 6- The universal template
The saved skeleton: act as [role], I need [task], the audience is [audience], the goal is [goal], format, and pasted material.
Review Lesson 6- The data dump
Pasting hundreds of lines and then asking. The fix is to summarize, label and structure first.
Review Lesson 6- Prompt template
Stage 2: a reusable prompt with variables you fill in.
Review Lesson 7- Prompt library
Stage 3: an organised set of prompts you pick from and run.
Review Lesson 7- Workflow asset
Stage 4: a brief run automatically by an agent, which the notes place in a later module of the course.
Review Lesson 7- System prompt
The saved brief — role, goal, audience, format, example — kept permanently instead of rewritten each time.
Review Lesson 7- Guardrails
What the assistant must never do, added to the saved specification.
Review Lesson 7- Custom Assistant Specification
The module's first deliverable: the saved brief that turns a one-off prompt into a standing setup.
Review Lesson 7- Definition of Done
The module's second deliverable: goal met, right audience and format, facts verified, nothing private leaked, nothing important missing.
Review Lesson 7