Study Library

Learn the source. Practise the decision.

Clear, source-grounded study guides that turn course materials into focused lessons, practical reflection, and interactive recall.

Course 01

Parental Study

Modules 1–5, Parts A–C, a workbook, video lessons, follow-ups and five coaching cases

Build parental-coaching awareness, practical skills, action planning, and professional boundaries, then support parent-led change, move from emotional reaction to intentional response, question the beliefs that keep parents stuck, rehearse calmer responses through guided visualization, understand how children develop from pregnancy to adolescence, support the whole family system, and practise everyday parenting skills from household rules to calm consequences. Rehearse five coaching cases with your own drafts, illustrative walkthroughs and MP3 narration.

Open parental study

Course 02

Project Management

Modules 1–7, Module 1 Session, five applied cases, and two exercises

Learn how to assess, govern, and authorize a project before commitment becomes expensive, define it clearly and set objectives that can be measured, charter it with its risks, stakeholders, and delegated authority, see a full charter applied to one project, contract it: who does what, how they are paid, who carries which risk, and how disputes are settled, build and lead the team that delivers it, schedule the work and find the critical path that decides its finish date, then estimate what it will cost and control it with earned value.

Open project management

Course 03

Agentic AI in Practice

Six modules, their hands-on exercises, prompt libraries and reading lists, and the final project

Learn the skill underneath the tools: what a large language model actually does and where it fails, how to brief and prompt it, and how to save that brief as a reusable assistant specification — then add the trust layer, an eight-check auditor that reviews the draft before a human approves it, the knowledge layer, where the assistant acts on real files with every action and number traced to a source, the workflow layer, where the steps become one repeatable shape with a stop rule on every loop, the automation layer, where a scheduled scenario replaces you as the power switch, and the responsibility layer, where a governed agent chooses its route inside policies you own — and a final project that proves all of it on your own workflow.

Open agentic AI

Course 04

AI-Assisted Coding

Five modules, a midcourse project, a final project, five prompt libraries and four reading lists

Build software with AI without giving up ownership of it: write prompts as specifications, inspect what comes back, run it, test it and refine it. One small Task Tracker grows from user stories and a FastAPI skeleton to tested endpoints and business rules, a frontend with safe refactoring and debugging, CI, containers, documentation and code review, and finally a security review, governance and context engineering — with a midcourse and a final project that prove each stage.

Open AI-assisted coding

Course 05

Design Principles

Imagery, typography, negative space and grids, from the supplied Week 1, 2 and 4 decks

Learn the visual decisions behind good design: what design is for and how imagery shapes a first impression, how to choose, edit, source and license images, how type is classified, chosen, paired, sized and set, and how negative space and grids give a layout its order. Type samples, grids and spacing are shown live on the page.

Open design principles

Course 06 · FA26-27

Project Planning, Scheduling and Controls - FA26-27

Six source study paths and four class recordings from October–November 2026

Start with the project life cycle, scope, work breakdown structure and project planning. Work through scheduling networks, critical paths, floats, probabilistic analysis and resource decisions. Study Week 5 Critical Chain Project Management, with buffers, bottlenecks and coordination across projects. Continue with dated class sessions on planning and control, scheduling relationships, PERT and probability, and resource allocation, leveling and smoothing. Each path includes focused lessons, source notes, a narrated reader, a glossary and practice.

Open planning and controls
01

Learn

Read one idea at a time in clear language, with examples and reflection prompts.

02

Trace

Use source notes and slide references to understand the original teaching focus.

03

Apply

Use knowledge checks and guided scenarios to practise reasoning, not just recognition.