Module 01
Context & Prompting: The Thinking Layer
What a large language model actually does and where it fails, how to break work into checkable steps, what a good briefing contains, how to prompt, and how to save the brief as a Custom Assistant Specification with a Definition of Done. Built from the supplied Module 1 lecture notes, readings and hands-on input.
Open Module 1Module 01 · Hands-on
Lina’s week
Five messy sources describing one week: a handwritten notebook, typed standup notes, a project export, four forwarded emails and a voice memo. Read across them, then build a briefing with signal rather than volume.
Open the hands-onModule 01 · Exercise
Build your own weekly brief assistant
The practice exercise, applied to a task you already repeat every week: declare a six-field specification yourself, make the assistant ask rather than guess, fold it into one standing instruction, and prove it with a before and after on the same inputs. A worked example follows the same eight steps through one real job.
Open the exerciseModule 01 · Reading
Further reading
The course’s own curated list: six core readings on how a model works and how to prompt it, three practical references to keep open while you build, and four optional deeper dives — each mapped to the part it supports.
Open the reading listModule 02
The AI Compliance Auditor: The Trust Layer
A separate reviewer that checks the work before a human approves it. The four ways a draft goes wrong, how to put an assistant in the reviewer’s chair, the eight-check rubric, the draft-audit-fix-re-audit loop, and a three-judge sequence for work that carries risk. Built from the supplied Module 2 lecture notes, readings and hands-on input.
Open Module 2Module 02 · Hands-on
The audit gate
The same five sources as the evidence pack, and your own Module 1 brief as the draft under audit. Run the eight checks, record a verdict, its evidence and the smallest fix, and end with a log marked REVIEWED — PASS or REVIEWED — BLOCKED.
Open the audit gateModule 02 · Reading
Further reading
Six core readings on why models state false things confidently and how AI can grade AI, three Claude references for building and saving the auditor, and four optional dives — each mapped to the stop it supports.
Open the reading listModule 03
Data & Document Intelligence: The Knowledge Layer
Let the assistant act across real files without letting it guess. Read before acting, keep every send behind a confirmation, name each source, turn bank exports and receipts into a clean ledger, and let the spreadsheet do the math. Built from the supplied Module 3 prompt library and reading list.
Open Module 3Module 03 · Hands-on
Lina’s knowledge layer
The prompt chain step by step: read the Evidence Room, draft a reply, book a meeting, add a task, set a reminder, then build a source registry, a clean ledger and formula totals, each step confirmed before it becomes real.
Open the hands-onModule 03 · Reading
Further reading
Five core readings on cleaning and structuring data, four Gemini and Google Workspace references for the hands-on, and four optional dives — each mapped to the stop it supports.
Open the reading listModule 04
Workflows & AI Task Execution: The Workflow Layer
Stop being the wiring between the steps. See any task as four moments, draw its diagram and twin documentation table, pick the smallest of five workflow patterns, describe it so an AI can build it, give every loop a stop rule, and assemble it once to run any week. Built from the supplied Module 4 lecture notes, readings and hands-on input.
Open Module 4Module 04 · Hands-on
Lina’s weekly workflow
Lina’s source pack, her written standards, the inherited eight-category audit gate with a three-attempt stop rule, and the output contract: every file the workflow must produce, with every external action kept as a draft.
Open the hands-onModule 04 · Reading
Further reading
Five core readings on workflow patterns, flowcharts, vibe coding and loop engineering, four Codex references for building and scheduling the workflow, and four optional dives — each mapped to the part it supports.
Open the reading listModule 04 · Prompt library
The Codex prompt chain
The hands-on recording’s eight prompts for Codex, from a deliberately vague request to a scoped delivery approval, plus six foundation prompts and four guardrails — each as a weak and an improved version.
Open the prompt libraryModule 05
Automation Systems & Agents: The Automation Layer
Stop being the power switch. Pick the lowest rung of the autonomy ladder that does the job, test what is worth automating, read any automation by its five parts, tell a script from a goal, and name the parts of an agent and the guardrails around them. Built from the supplied Module 5 lecture notes, readings, hands-on run-of-show and prompt library.
Open Module 5Module 05 · Hands-on
The weekly brief scenario
A fixed five-module Make scenario: a Google Sheets trigger, a summarizer, a separate auditor and a finalizer, and a Google Doc. Capture a real bundle, map one field at a time, inspect every module, and only then give it a schedule.
Open the hands-onModule 05 · Prompt library
The Make prompt chain
Eight hands-on prompts from the Scenario Build Brief to the scheduling decision, four foundation prompts and four guardrails — no Tools on a block, no early schedule, no bundle mapping, no exposed key.
Open the prompt libraryModule 05 · Reading
Further reading
Five core readings on agentic workflows, AI agents and automation tools, four Make references for building the scenario, and four optional dives — each mapped to the stop it supports.
Open the reading listModule 06
The Responsibility Layer: A Governed Agent
Let an agent choose its own route without letting it choose its own rules. One goal and a small named tool set, tool contracts, four policies compiled into a checkpoint with two answers, separate drafting, auditing and permission, and three tests that prove it stops. Built from the supplied Module 6 prompt library.
Open Module 6Module 06 · Hands-on
Lina’s governed brief agent
The eight-prompt chain for a Make AI Agent: the Build Brief, four tool contracts, the complete Auditor, Governance and agent instructions, three test rows, and the written decision before the schedule.
Open the hands-onFinal course project · Modules 4-6
Automate, govern, and prove an end-to-end agentic workflow
The assignment that closes the course: eight required parts, six numbered submission items, the minimum run log and six criteria that must all be Met. Prove operation and control with a normal run, a policy stop and a handled failure.
Open the final projectFinal project · Worked example
The final project, step by step
One learner’s 18-step route: a local controller built with Claude Code, two human gates, a frozen policy, offline control tests, three proof runs and the six deliverables, with ten builder prompts to copy.
Open the worked example