Agentic AI in Practice · Module 05

Module 5 · Automation Systems & Agents

The automation layer: stop being the power switch.

Five short lessons on deciding how much a system does without you. Pick the lowest rung of the autonomy ladder that does the job, test what is worth automating, read any automation by its five parts, tell a script from a goal, and name the parts of an agent and the fence around them.

  • Autonomy ladder
  • What to automate
  • Five parts
  • Script vs. goal
  • Agent anatomy

Module introduction

Stop being the power switch.

By the end of Module 4 you had a working workflow: the intern who drafts, the auditor who checks, the Data Steward who organizes and the Architect who designed it. The notes name what is still wrong. You are the power switch. You open one chat, paste into the next and update the ledger by hand, and it only happens on the weeks you show up. Skip a Sunday and nothing runs. Module 5 adds the automation layer: you decide how much autonomy to hand over, then let a system, and eventually an agent, close the loop for you.

The autonomy ladder · Module 5 lecture notes p. 2
  1. Rung 1AssistantYou ask, it answers, once.
  2. Rung 2AutomationThe same sequence on a trigger, every time.
  3. Rung 3OrchestratorSeveral fixed pieces, one feeding the next.
  4. Rung 4AgentA goal, not a script: it decides its own steps, and when to ask you.

Each rung does more without you. Match the task to the lowest rung that does the job.

Your learning path

Five short lessons, then one scenario that runs on a schedule.

Open source guide
01How much rope?Autonomy is a dial, not an on and off switch. Four rungs, Assistant, Automation, Orchestrator and Agent, each do more without you. Match the task to the lowest rung that does the job.10 min02What to automateAutomate the repeatable, rule-based, frequent, low-judgment tasks, and leave the rare and high-judgment ones to a person. You don’t need code: the no-code tools turn trigger, actions, done into blocks you connect.11 min03Name the five partsEvery automation, however complex, is built from five parts. Trigger starts it, Action does it, Condition forks it, Approval pauses it, Log remembers it. Name them and you can read any automation on sight.11 min04Workflows to agentsA fixed workflow only ever does what you scripted. An agent is given a goal instead, and decides its own steps to reach it, inside limits you set. The moment it re-plans is what agentic means in practice.12 min05Anatomy of an agentFive parts and a fence. Goal, Brain, Planning, Memory and Tools, wrapped in guardrails, describe every agent you will build or judge. Agents also fail in their own ways, because the failures come from the reasoning itself.13 minWhat you keep from Module 5Each part in one line, the five Mental Model cards, and the deliverable bundle.SummaryHands-on: the weekly brief scenarioA Sheet trigger, three OpenAI roles and a Google Doc, built in Make in eleven steps and tested before it is scheduled.Hands-onPrompt libraryThe hands-on chain H1 to H8, four foundation prompts and four guardrails, each as a weak and an improved version.PromptsFurther readingFive core readings, four Make references and four optional dives, mapped to the module's stops.Reading