The candidate test
The notes give four questions. A good candidate for automation passes all four.
- Repeatable The same shape each time.
- Rule-based A clear if-this-then-that.
- Frequent It happens often enough to earn the setup.
- Low-judgment A machine shouldn’t be the one making a risky call.
What not to automate
The other half of the test is just as specific. For each of these, the notes say a person keeps it: automating it adds risk without saving real time.
| Keep it human when it is | For example |
|---|---|
| One-off or rare | A one-time big decision |
| High-judgment or high-stakes | A hard conversation |
| Changing shape every time | Never the same twice |
| About relationships or a sensitive call | A condolence note |
Candidates you already have
The notes list everyday tasks that pass the test. Most people have several of them already.
- A weekly spending summary.
- Sorting new files into folders.
- A reminder before every bill.
- Form responses copied into a sheet.
- A Monday digest.
- Saving attachments to the right folder.
You don’t need code
The notes name three no-code tools. All three turn the same idea, trigger, then actions, then done, into blocks you drag and connect.
| Tool | How the notes describe it |
|---|---|
| Zapier | The simplest, with a huge app library |
| Make | The most visual, with a branching canvas |
| n8n | The most flexible, and open-source |
Read with careThese are the notes’ descriptions at the document’s date, not a comparison made here. The hands-on builds in Make.
Mental Model card #22 · When to reach for it
The second card is the candidate test and the tooling in two lines.
- Automate the repeatable, rule-based, frequent, low-judgment tasks; leave the rare and high-judgment ones to a human.
- You don’t need code: Zapier, Make and n8n all build it by drag-and-drop.
Key takeaways
- A good candidate is repeatable, rule-based, frequent and low-judgment.
- Keep one-off, high-stakes, shape-shifting and sensitive work with a person.
- Most people already have several candidates, such as a weekly summary or a bill reminder.
- Zapier, Make and n8n all build trigger, actions, done without code.