Agentic AI · Module 5Prompt library

Prompt library · 16 prompts

Module 5 prompt library

Practical prompts for planning a Make.com scenario, writing the maker/checker/finalizer roles, and turning a tested trigger into a schedule.

How to use this library
  • Work from the real Make.com scenario this hands-on builds: Google Sheets “Watch New Rows” → three OpenAI “Generate a response” modules (Summarizer, Auditor, Finalizer) → Google Docs “Create a Document.”
  • Separate planning from building. A Build Brief plans the five-module shape before you open Make; the three OpenAI prompts (H4–H6) are what you paste directly into the modules; Run once tests before any schedule turns on.
  • Replace placeholders such as [YOUR ONE-COLUMN INPUT] and [YOUR RECURRING TASK]. Never leave a placeholder in a live module.
  • Map one exact field, never a whole bundle. Every OpenAI block should receive only the specific token it needs — not “the previous module's entire bundle.”
  • Keep every field mapping visible. Each hands-on prompt names exactly what crosses into the next block, so a second person could check your scenario without guessing.
  • Use the optional guardrail prompts (Part E) only when you catch a scenario slipping — Tools turned on in an OpenAI block, a schedule switched on before testing, or a secret key pasted somewhere it shouldn't be.

Key mindset Make owns the route, not the model. Every module names its exact field, and no schedule turns on before one full, inspected run.

H1 · H2 · H3 · H4 · H5 · H6 · H7 · H8

Hands-on prompt chain — Lina's Weekly Brief Automation

These prompts are the exact build chain from the Module 5 hands-on recording. You plan in ChatGPT, then build in Make.com: a Google Sheet named “Executive Weekly Updates,” a Drive folder named “Generated Weekly Briefs,” and a saved OpenAI connection with a project-scoped key. Keep the placeholders and replace them only when you run the prompt.

H1 · Acting before designing

Use this first, before H2, to show why asking for the whole automation in one shot leaves the maker/checker/finalizer boundaries — and the field mappings — inside guesses.

Weak versionJust automate my weekly update into a brief in Make.

Improved version · H1Turn my weekly update into an automated executive brief. Use my Google Sheet, summarize the update, check the summary, and produce a final Google Doc. Do not build anything yet. Show me the plan you would use.

Why it is betterEven this version is deliberately incomplete — it leaves “check” and “produce” undefined, and doesn't say what a checker failure looks like, whether Tools are ever needed, or when the scenario is allowed to run on its own.

The mistake it avoidsTreating a plausible-sounding three-step plan as a designed scenario. A real Make scenario needs named modules and named fields, not a paragraph.

Hands-on / why blind automation requests fail · Prompt library p. 3

H2 · Declare the Scenario Build Brief

Use once, right after H1, to replace the vague request with an exact five-module shape: what triggers it, what each block receives and returns, and what “done” looks like.

Weak versionJust design whatever makes sense and I'll adjust it once I see it in Make.

Improved version · H2DESIGN MODE — do not write any module configuration, do not open Make, do not call any API. TASK: Plan a fixed, five-module Make.com scenario that turns one new weekly update into an audited, formatted executive brief. TRIGGER: Google Sheets — Watch New Rows, on a sheet named Executive Weekly Updates with one column, Weekly Update. MODULES: (1) OpenAI — Draft Executive Summary, receives only the new row's Weekly Update field, returns a draft. (2) OpenAI — Audit Draft Summary, receives the original Weekly Update and the draft's Result, returns a Pass/Needs Correction verdict and correction instructions — never a rewritten brief. (3) OpenAI — Final Executive Brief, receives the original, the draft's Result, and the audit's Result, returns clean HTML. (4) Google Docs — Create a Document, receives only the finalizer's Result. DECISION RULE: the auditor never replaces the finalizer; it only gives correction instructions the finalizer may apply. ACTION RULE: Tools stay empty in every OpenAI block — this is a fixed scenario, not an agent. No schedule turns on until one full Run once succeeds. DEFINITION OF DONE: return (A) the five-module blueprint in order, (B) which exact field each module receives, and (C) the API connection and Drive folder this needs. Then stop. Before I build, list only the mapping decisions that are still genuinely open.

Why it is betterNaming the four modules and their exact inputs up front means every field mapping in Make becomes a checklist item instead of a guess made while clicking around the canvas.

The mistake it avoidsSkipping straight into Make and discovering, three modules in, that the auditor never actually received the original update.

Hands-on / plan before you build · Prompt library pp. 3-4

H3 · Freeze the blueprint with your mapping decisions

Use right after your plan is set, to turn “map the right fields” into a stable, checkable list you can follow inside Make.

Weak versionSure, just map whatever fields seem right when you get there.

Improved version · H3Here are my mapping decisions: – OpenAI 1 (Summarizer) receives only Google Sheets > Weekly Update. Never the whole trigger bundle. – OpenAI 2 (Auditor) receives Google Sheets > Weekly Update and OpenAI 1 > Result. – OpenAI 3 (Finalizer) receives Google Sheets > Weekly Update, OpenAI 1 > Result, and OpenAI 2 > Result. – Google Docs receives only OpenAI 3 > Result in its Content field. – All three OpenAI blocks leave Tools empty. – The finalizer returns raw HTML — no Markdown, no code fences. – No schedule turns on until one full test row completes successfully. Update the blueprint with these exact fields and stop.

Why it is betterNaming the exact field for every arrow — not “the result” but “OpenAI 1 > Result” — is what makes a second person able to check your scenario by opening the same module bubbles you did.

The mistake it avoidsMapping “the previous module's output” loosely and letting Make suggest a bundle field instead of the one you actually meant.

Hands-on / name every field before you build · Prompt library pp. 4-5

H4 · Paste the Summarizer prompt (OpenAI block 1)

Use once the trigger has captured a sample row, to build the first OpenAI module — the one that drafts, and receives only the original update.

Weak versionSummarize this update for an executive.

Improved version · H4You are preparing a concise weekly executive briefing. Your task is to summarize the original weekly update into a clear, professional, and accurate draft. Organize the draft under these headings when relevant: Executive Summary, Key Achievements, Financial Updates, Risks and Blockers, Decisions Needed, People Updates, Next Week Priorities. Rules: use only information stated in the original weekly update; do not invent, assume, or add information; preserve important names, amounts, percentages, dates, and deadlines; clearly distinguish completed work from planned work; clearly distinguish confirmed facts from uncertain or pending information; do not present a possible amount as a confirmed amount; do not present a possible delay as a confirmed final decision; omit headings with no relevant information; keep the draft concise and professional; use no more than 10 bullet points in total. ORIGINAL WEEKLY UPDATE: [MAP: Google Sheets > Weekly Update]

Why it is betterNaming which headings to use, which facts to preserve exactly, and which uncertainty language to keep intact is what stops a “concise summary” from quietly turning a maybe into a certainty.

The mistake it avoidsMapping Google Sheets > Watch New Rows [bundle] instead of the one Weekly Update field, which sends every column and piece of metadata into the prompt.

Hands-on / the maker · Prompt library pp. 5-6

H5 · Paste the Auditor prompt (OpenAI block 2)

Use once the summarizer is producing a draft, to build a checker that never sees only the draft — it needs the source too.

Weak versionCheck if this summary sounds right.

Improved version · H5You are a strict factual auditor reviewing an AI-generated executive briefing. You will receive: (1) the original weekly update, (2) a draft executive summary. Compare the draft against the original source. Audit for: facts invented or unsupported by the original; important facts omitted; incorrect names, amounts, percentages, dates, or deadlines; confusion between completed and planned work; confusion between confirmed and uncertain information; altered or misrepresented financial values; overlooked risks, blockers, decisions, or approvals; repetition; misleading wording; statements too strong or too vague; poor organization or excessive length. Rules: treat the original update as authoritative; do not invent new facts; do not write a replacement briefing; provide correction instructions for the final editor; be specific; if the draft is fully accurate, clearly state that no corrections are required. Return using this structure: AUDIT RESULT (Pass or Needs Correction); ACCURACY ISSUES; IMPORTANT OMISSIONS; CLARITY AND STRUCTURE ISSUES; REQUIRED CORRECTIONS. ORIGINAL WEEKLY UPDATE: [MAP: Google Sheets > Weekly Update] DRAFT EXECUTIVE SUMMARY: [MAP: 1 - Draft Executive Summary > Result]

Why it is betterThe audit categories are specific — invented facts, omitted risks, confused certainty — and the instruction to give correction instructions rather than a rewrite is what keeps the checker from quietly becoming a second maker.

The mistake it avoidsMapping only OpenAI 1 > Result into the auditor, which means it's grading a draft against nothing.

Hands-on / the separate checker · Prompt library pp. 6-7

H6 · Paste the Finalizer prompt (OpenAI block 3)

Use once the auditor is returning verdicts, to build the block that actually produces what the reader sees.

Weak versionFix this summary based on the feedback.

Improved version · H6You are the final editor of a weekly executive briefing. You will receive: (1) the original weekly update, (2) a draft executive summary, (3) an auditor's evaluation of the draft. SOURCE PRIORITY: the original weekly update is authoritative. Apply an auditor recommendation only when it's supported by the original. CONTENT RULES: correct every valid issue the auditor identified; restore important omitted source information; remove statements unsupported by the original; do not invent information; preserve names, amounts, percentages, dates, deadlines, and uncertainty language (don't change “probably delayed” into “delayed”); distinguish completed, ongoing, and planned work; stay concise, professional, and non-repetitive; omit sections with no relevant information; never mention the draft, auditor, audit, or review process. OUTPUT FORMAT: return only clean HTML — <h1> for the title, <h2> for section headings, <p> for the summary paragraph, <ul>/<li> for bullets, <strong> only when useful. No Markdown. No code fences. No introductory comments. ORIGINAL WEEKLY UPDATE: [MAP: Google Sheets > Weekly Update] DRAFT EXECUTIVE SUMMARY: [MAP: 1 - Draft Executive Summary > Result] AUDITOR FEEDBACK: [MAP: 2 - Audit Draft Summary > Result]

Why it is better“Source priority” and “apply a recommendation only when supported by the original” keeps the auditor's advice from being applied blindly, and the strict HTML-only rule keeps the final Doc from showing raw Markdown or code fences.

The mistake it avoidsLetting the finalizer see only the draft and the audit, without the original update, which removes its ability to check the auditor's own suggestions against the source.

Hands-on / the final editor · Prompt library pp. 7-8

H7 · Sanity-check your mapping plan before you build

Use in ChatGPT, blueprint in hand, right before you open Make — a cheap way to catch a mapping mistake before it's live in three modules.

Weak versionThis all looks fine, let's just build it.

Improved version · H7Review my planned field mappings against the Build Brief above. For each of the four modules, confirm: (1) it receives only the fields I named, nothing broader; (2) no module receives a whole bundle when one field would do; (3) the auditor's output is never mapped anywhere as if it were the final brief. Return a PASS/FAIL for each module with the reason.

Why it is betterThe most common Make.com mistake is mapping an entire bundle out of convenience — catching that on paper, before you're three modules into a live build, costs a sentence instead of a rebuild.

The mistake it avoidsTreating a scenario that runs without erroring as a scenario that's actually correct. A wrong field can return a plausible-looking Result that's quietly built from the wrong input.

Hands-on / catching a whole-bundle mapping before it happens · Prompt library p. 8

H8 · Turn a tested trigger into a schedule

Use last, only after one full test row has produced a correct Google Doc. This is the one prompt that isn't pasted into an AI — it's the decision you write down before you touch the schedule control.

Weak versionJust turn scheduling on so it's live.

Improved version · H8Before I turn scheduling on: (1) I ran Run once successfully — all five modules completed, and the created Google Doc had the right headings and content. (2) I chose [YOUR INTERVAL] as the check frequency — this does not make the scenario an agent, it just gives it a clock. (3) The API key is only visible in the masked connection field, never in a prompt or the Sheet. Turn scheduling ON.

Why it is betterWriting the decision down before clicking the toggle is what stops “it looked like it worked” from becoming a live, unattended process nobody actually verified end to end.

The mistake it avoidsTurning scheduling on right after the first successful Run once, without re-running the full inspection of Input and Output on every module.

Hands-on / Run once, then decide the interval · Prompt library pp. 8-9

P0 · P1 · P2 · P3

Foundation prompts from the lecture

These prompts let you practice the core ideas from the lecture on your own recurring task — replace [YOUR ONE-COLUMN INPUT] with meeting notes, customer feedback, project status, or your own equivalent.

P0 · Name your one-column input before you design

At the start of any Make.com build, before opening the canvas.

Weak versionCan you help me build an automation for this spreadsheet?

Improved version · P0I'm building a Make.com scenario around a Google Sheet with one input column: [YOUR ONE-COLUMN INPUT]. Before I open Make, help me plan the same five-stage shape: trigger, draft, audit, final, deliver.

Why it is betterNaming the one column up front is what keeps the whole scenario from quietly growing extra input fields nobody planned for.

The mistake it avoidsStarting from “what could this automation also do” instead of the one column actually in front of you.

One Sheet, one clear input · Prompt library p. 9

P1 · Design the scenario before you open Make

Whenever you're tempted to open Make and start dragging modules before the shape is decided.

Weak versionBuild me an automation that handles this end to end.

Improved version · P1DESIGN MODE — do not open Make or configure anything yet. TRIGGER: [name it]. MODULES: [list each one, what it receives, what it returns]. DECISION RULE: [how the auditor's verdict is used]. ACTION RULE: [Tools empty; no schedule until tested]. DEFINITION OF DONE: the five-module blueprint with named fields. Then stop.

Why it is betterIt separates deciding the shape from building it — the same discipline as Module 4's Build Brief, applied to a visual canvas instead of a chat.

The mistake it avoidsSkipping straight to configuring the first module and discovering the shape was wrong two modules later.

Build Brief, generalized · Prompt library pp. 9-10

P2 · Map one field, not a bundle

Any time a module's input field could plausibly be filled by dragging in an entire bundle instead of one value.

Weak versionJust map whatever Make suggests.

Improved version · P2For every module input, name the exact field crossing into it — not ‘the result’ or ‘the row,’ but the specific token, like OpenAI 1 > Result or Google Sheets > Weekly Update. If a module needs more than one field, list each one separately and label what it's for.

Why it is betterA named field is checkable by opening the module's Input bubble; a mapped bundle is not — it silently carries everything, including fields nobody meant to send.

The mistake it avoidsAccepting Make's suggested mapping without checking whether it grabbed the whole bundle instead of the one field you needed.

Vague tokens become named fields · Prompt library pp. 10-11

P3 · Separate the maker, the checker, and the finalizer

Any time an automation drafts, checks, and finalizes — resist the urge to combine any two of these into one module.

Weak versionJust have one prompt do the drafting and checking together.

Improved version · P3Build three separate OpenAI blocks: one drafts from the source only; one checks the draft against the source and returns correction instructions, never a rewrite; one applies corrections and returns the final output, seeing the source, the draft, and the audit together. Do not combine any two of these roles into one block.

Why it is betterA checker that also drafts is grading its own work — separating the roles is what makes the audit meaningful, the same principle Module 2 established for a single draft.

The mistake it avoidsMerging the checker and finalizer into one block “to save a module,” which quietly removes the one step that catches the checker's own mistakes.

Three roles, three prompts · Prompt library p. 11

E1 · E2 · E3 · E4

Optional extension — guardrails for the scenario

Use these only when you catch the scenario — or yourself — slipping.

E1 · Guardrail — no Tools on an OpenAI block

When an OpenAI block in the scenario has Tools enabled, or is given access to search, code, or another action.

Weak versionIt's fine, turning on a tool just makes it smarter.

Improved version · E1Leave Tools empty on every OpenAI block in this scenario. If a block needs to take an action beyond generating text, that's a new module Make coordinates — not a tool the model chooses to use itself. This scenario is fixed and human-designed; it does not choose its own next step.

Why it is betterThe instant a block can choose to call a tool, the scenario stops being the fixed, auditable path this module is teaching — that's the exact line between a scenario and an agent.

The mistake it avoidsTreating “give it tools” as a free upgrade instead of the specific design decision that turns this into a different, more autonomous kind of system.

Optional extension / agent creep · Prompt library pp. 11-12

E2 · Guardrail — no schedule before testing

When scheduling gets turned on before a full Run once has succeeded end to end.

Weak versionIt probably works, let's just turn on the schedule.

Improved version · E2Do not enable scheduling until one complete Run once has produced a correct final Google Doc, and every module's Input and Output has been inspected. The schedule gives the scenario a clock — it should never be the first time the full path actually runs.

Why it is betterA scheduled scenario that was never fully tested fails quietly, on its own, with nobody watching — the exact opposite of what a schedule should buy you.

The mistake it avoidsTrusting that a scenario which built without errors will also run correctly once nobody is watching it.

Optional extension / early automation · Prompt library p. 12

E3 · Guardrail — no whole-bundle mapping

When a module's input field contains an entire bundle instead of one named token.

Weak versionJust map the bundle, it has everything in it anyway.

Improved version · E3Replace any bundle-level mapping with the one specific field this module actually needs. If a module genuinely needs several fields, map each one separately and label it, rather than passing the whole bundle and hoping the prompt sorts it out.

Why it is betterA bundle mapping quietly sends every field, including ones never meant to reach that block — exactly how an auditor prompt can end up receiving row metadata instead of the update it's supposed to check.

The mistake it avoidsMapping a bundle because it's the first suggestion Make offers, rather than the field you actually planned to send.

Optional extension / oversharing fields · Prompt library pp. 12-13

E4 · Guardrail — no key in a prompt or Sheet

When an API key is ever pasted into a prompt, a Sheet cell, a chat, or a recording instead of the masked connection field.

Weak versionIt's just a demo, it's fine to paste it once.

Improved version · E4Never paste the OpenAI API key anywhere except Make's own masked connection field. Not in a prompt, not in the Sheet, not in chat, not in a screen recording. If a key is ever exposed, revoke it immediately and create a replacement before continuing.

Why it is betterA key that appears once, anywhere outside the masked field, has to be treated as compromised — there's no partial exposure.

The mistake it avoidsAssuming a key shown briefly, or in a demo account, is low-risk enough to skip revoking.

Optional extension / credential exposure · Prompt library p. 13

End-of-module checklist

The library closes with what you should have produced and saved before moving on.

End-of-module checklist · Module 5 prompt library p. 14
DeliverableWhat to check
Input Sheet“Executive Weekly Updates” (or your own one-column version) with one header row and no blank rows inside the data.
Scenario BlueprintThe five-module shape — trigger, three named OpenAI roles, one delivery module — with every field mapping named, not assumed.
Three OpenAI PromptsSummarizer, Auditor, and Finalizer prompts saved and pasted correctly, with Tools left empty in all three.
Mapping ProofEach module's Input bubble shows exactly the fields you planned — Sheet, then Sheet + draft, then Sheet + draft + audit.
Output ProofA correctly formatted Google Doc created from the finalizer's Result only, with real headings and bullets.
ScheduleTurned on only after one full Run once succeeded, with the API key never exposed outside the masked connection field.

Every prompt, its reasoning and the checklist are from the supplied Module 5 prompt library (14 pages). Prompt text is reproduced as printed, placeholders included. Back to the module.