Project management · FA26-27
Project Planning, Scheduling and Controls - FA26-27
Build a schedule you can explain. Follow the source guides and class recordings from project planning to schedule confidence, resource capacity and critical chain buffers.
Source study paths
Build the foundations and project plan, practise scheduling, assess uncertainty, plan resources, then study critical chain buffers in Week 5.
Week 1
Week 1 Introduction to Project Management
Six lessons from the supplied Week 1 summary: recognize projects, follow the life cycle, balance constraints, break down the work, manage scope, and distinguish the Project Charter from the Scope Statement.
Open Week 1Project planning
Project Planning, WBS and Scope Management
Five lessons from the twelve-slide planning summary: project success, the Management Plan, requirements traceability, work packages, the scope baseline, acceptance, quality and controlled change.
Open Project planningAssignment project
Project Scheduling and Network Analysis
A guided study of Fadi Zahhar's completed scheduling assignment: five networks, complete activity tables, delay effects, mixed precedence and float, followed by the learning guide's separate PERT and expected-value example.
Open Scheduling assignmentWeek 3 · Source study path
Explain the uncertainty behind a completion date
Study all eighteen slides of the probabilistic schedule analysis deck. Work through the duration records, normal illustration, complete four-activity PERT example, simulation assumptions and completion percentiles, with source notes and practice.
Open probabilistic schedule analysisResource planning
Resource Allocation, Leveling and Smoothing
Six lessons from Farah Demachkieh's detailed PDF and twelve-slide companion: resource types, responsibility matrices, capacity tests, cumulative supply, priorities, loading charts, and the worked compressor comparison between leveling and smoothing.
Open Resource allocationWeek 5
Week 5 Critical Chain Project Management
Six lessons from the supplied Week 5 summary: causes of delay, three buffer roles, the Theory of Constraints, critical chain versus critical path, the portfolio drum, and CCPM’s stated benefits and limitations.
Open Week 5Course resources
Your course study tools
Find the source guides for the documents and every class recording. Return to each summary, glossary and practice when you need them.
Open the resourcesClass recordings · October–November 2026
Study the sessions in date order, with explanations, source notes and practice for each recording.
Live session · 29 October 2026
Planning, WBS and scope management
Seven lessons from the first recorded live session: define success, connect planning and control, trace requirements, build the WBS, use a scope baseline, verify delivery and apply the closing discussion on tools, Agile and human judgment.
Open 29 October sessionClass recording · 5 November 2026
Build a schedule you can actually use
Seven connected lessons unpack the second live session: WBS and activities, dependencies and constraints, productivity and availability, CPM and float, progress views and baseline control, then compression with multiple critical paths. The closing learner questions are integrated into the explanations.
Open 5 November recordingClass recording · 12 November 2026
How confident is the completion date?
Study the complete 12 November class: descriptive statistics, estimation bias, normal models, the central limit theorem, PERT, Monte Carlo, distribution selection and percentile decisions. The learner Q&A also revisits network passes, SS+5, time conventions and hard versus soft logic.
Open 12 November sessionClass recording · 19 November 2026
Can the available resources deliver the schedule?
Study the complete fourth live session: allocation and loading, resource types, WBS–OBS–RACI, worker-week capacity, equipment priorities and the compressor example. The learner Q&A extends the distinction between smoothing and leveling to finance, cost and AI-assisted work.
Open 19 November sessionAbout this course
Build the schedule, then make the resources work.
A study path for Project Planning, Scheduling and Controls - FA26-27. Begin with the Week 1 foundations and project planning, work through the scheduling assignment and probabilistic schedule analysis, then connect the schedule to resource demand and capacity. Week 5 introduces Critical Chain Project Management, centralized buffers, bottlenecks and coordination across projects. Study the class recordings of 29 October, 5 November, 12 November and 19 November 2026 in order: planning and control, scheduling relationships, PERT and probability, and resource allocation, leveling and smoothing. Each path brings together focused lessons, source notes, a summary, a glossary and practice.
Read the lessons in order, try the examples on a project you know, then check your understanding with realistic scenarios and a knowledge check. Use Listen to hear a lesson read aloud. Your lesson progress and quiz result stay on this device.
Weeks 1 and 5 follow their lecture summaries. Project Planning and Probabilistic Schedule Analysis follow their supplied slide decks. The scheduling path follows the completed assignment and its learning guide, with the original assumptions and time conventions made explicit. Resource Allocation, Leveling and Smoothing brings together the PDF and its companion deck. The dated session paths follow their class recordings. Source notes distinguish supplied examples and worked results from added teaching examples.
Week 1 source guide →Project planning source guide →Scheduling assignment source guide →probabilistic schedule analysis source guide →Resource allocation source guide →Week 5 source guide →29 October session source guide →5 November recording source guide →12 November session source guide →19 November session source guide →