Resource Allocation, Leveling and Smoothing

Make the schedule fit the people, equipment and supplies that can actually deliver it.

Six lessons from Farah Demachkieh's detailed PDF and twelve-slide companion: resource types, responsibility matrices, capacity tests, cumulative supply, priorities, loading charts, and the worked compressor comparison between leveling and smoothing.

  • Resource types
  • WBS and OBS
  • RAM and RACI
  • Capacity and feasibility
  • Resource loading
  • Priority rules
  • Leveling
  • Smoothing

Module introduction

A valid network still needs a feasible resource plan

A schedule can respect every predecessor and still assign more workers or equipment than the organization has. This study path connects responsibility with availability, tests the timing of resource demand, and follows the deck's worked examples to show what changes when the deadline or the resource pool takes priority. Read the explanations, reconstruct the calculations and diagrams, then use the practice feedback to test your decisions.

Your path from ownership to a workable resource schedule
  1. AssignWork, resource types and responsibility
  2. LoadPlace demand against available supply
  3. AdjustUse float, priorities and capacity options
  4. VerifyCheck dependencies, resources and finish

Your learning path

Your path through resource planning

Open source guide
01Resources and responsibilityResource planning connects the work to the people, equipment, materials and funding it needs. Start by distinguishing resource types, then use the WBS, OBS and responsibility matrix to make ownership clear.9 min02Worker capacity and feasibilityThe five-activity example requires 101 worker-weeks and has nine workers available per week. Its twelve-week network schedule passes a total-capacity check but overloads individual weeks. Follow the early and late schedules, then interpret the duration bound carefully.10 min03Supply and resource loadingFinite resources need to arrive before they are consumed. Compare cumulative supply with cumulative requirements, then connect resources to the time-phased baseline so conflicts become visible before execution.8 min04Constraints and priority rulesA fixed deadline, a fixed resource pool and a project with both limits call for different trade-offs. Use the deck's five priority rules as scheduling aids, then choose a practical response and check the resulting schedule again.9 min05Build and smooth the chartFollow the six-activity loading-chart example from network dates to a resource profile. Then split C within its available float to reduce the peak from nine resource units to seven while preserving the twelve-day finish.9 min06Leveling versus smoothingThe seven-activity compressor example begins with a twenty-day critical-path schedule and six overloaded days. Leveling respects the six-compressor limit and finishes in twenty-two days. Smoothing keeps twenty days and leaves two days needing extra capacity.11 minWhat to keep from resource allocationResource planning joins ownership, the timing of demand and the limits of supply. A good decision makes clear which constraint it protects and verifies the whole revised schedule.Summary