Project Planning, Scheduling and Controls - FA26-27 · Live session · 29 October 2026

Planning, WBS and scope management

A clear purpose, manageable work and an agreed reference for delivery and change.

Seven lessons from the first recorded live session: define success, connect planning and control, trace requirements, build the WBS, use a scope baseline, verify delivery and apply the closing discussion on tools, Agile and human judgment.

  • Project success
  • Monitoring and control
  • Requirements
  • WBS
  • 100% rule
  • Scope baseline
  • Acceptance and quality
  • Controlled change
  • Agile and hybrid planning

Module introduction

Make the agreed work visible

The 29 October session reviews Week 1 and answers practical questions about organizing real projects. Follow its central sequence: define the project, plan the work, break it down, verify delivery and control changes. These lessons preserve the lecture's distinctions while removing attendance interruptions and course administration. Illustrative study examples, diagrams and practice help you apply the ideas; the closing Q&A remains identified as contextual discussion.

The five-part sequence used in the live review
  1. DefinePurpose, needs and success
  2. PlanWork, people and resources
  3. Break downManageable work packages
  4. VerifyComplete and acceptable delivery
  5. ControlInformed change decisions

Your learning path

Your path through the 29 October session

Open source guide
01Purpose and successThe first live session connects a project's temporary, unique result to progressive elaboration, life-cycle stages and the balance between scope, time, cost and client acceptance. A clear direction helps the team recognize both a worthwhile result and the trade-offs needed to deliver it.6 min02Planning and controlPlanning, execution, feedback and decisions form a continuous loop. Monitoring measures what is happening; control uses that information to decide and act. The approved project management plan connects the work, people, methods, schedule and budget that make the loop useful.6 min03Scope and requirementsThe Charter authorizes, the Scope Statement defines the work, and the management plan explains delivery and control. Scope management starts with stakeholder needs, makes inclusions and exclusions explicit, and traces requirements so they remain visible as work develops.7 min04WBS and work packagesA WBS makes a large scope manageable by breaking it into smaller parts. The recording explains the hierarchy, the lowest work-package level, a reasonable degree of detail and the 100% rule. The resulting breakdown supports estimates, responsibility, resources, schedules and control.7 min05Baseline and dictionaryThe approved scope baseline brings together the Scope Statement, approved WBS and WBS dictionary. It gives the team a reference for judging the work and assessing requests. An approved change can update the baseline after its implications are considered.6 min06Acceptance and changeCompleteness, quality and scope control ask different questions. The lecture's food-package example makes that distinction concrete. Its change sequence then moves from a request through impact assessment and a decision to any necessary baseline update.6 min07Applied session discussionThe closing discussion addresses tools for different project sizes, the relationship between a WBS and Agile user stories, and hybrid planning for an overall deadline. It also explains how AI can help present an idea while the learner remains responsible for the thinking and review.7 minThe agreed work becomes your referenceThe session connects project purpose to a manageable scope, an approved reference and decisions informed by performance. Good planning gives direction and a systematic response to problems; it does not promise a problem-free project.Summary