Project Planning, Scheduling and Controls - FA26-27 · Class recording · 5 November 2026

Build a schedule you can actually use

From complete scope and honest logic to realistic durations, controlling paths and defensible acceleration decisions.

Seven connected lessons unpack the second live session: WBS and activities, dependencies and constraints, productivity and availability, CPM and float, progress views and baseline control, then compression with multiple critical paths. The closing learner questions are integrated into the explanations.

  • Executable schedules
  • Logic and constraints
  • Productivity
  • CPM and float
  • Baselines and S-curves
  • Compression

Module introduction

Follow the delivery story from scope to control

The session's main message is that a useful schedule models actual delivery. Each step depends on the one before it: define the work, connect it honestly, resource and time it realistically, analyze the controlling paths, and preserve an approved reference for management decisions. This guide turns the full recording and its Q&A into a connected study path.

The complete scheduling story in the live session
  1. DefineScope, work packages and activities
  2. ModelLogic, resources and duration
  3. AnalyzeCPM, early/late dates and float
  4. ControlBaseline, progress and compression

Your learning path

Study the recording in seven connected lessons

Open source guide
01Scope to executable workA useful schedule models how the project will actually be delivered. Begin with complete scope, break it into manageable work packages and measurable activities, then connect and resource that work before asking software for dates.7 min02Logic and dependenciesEvery relationship should explain a real handoff or an intentional way of working. Distinguish hard, soft and false logic, understand the four relationship types, and keep meaningful work visible instead of hiding it in lags or imposed dates.9 min03Realistic durationsA duration should have an explanation. The session connects the quantity of work, the productivity of a crew and the number of crews, then asks how much of nominal working time can actually be used for project work.7 min04CPM and controlling pathsCPM analyzes the work after its scope, logic, resources and durations are defined. The longest dependent path determines the unconstrained project duration, while forward and backward passes describe early and late timing.8 min05Total, free and negative floatTotal float protects the project finish or a required milestone. Free float protects the next activity's early start. Negative float signals a date conflict. Understand which commitment a float measure protects before using it.6 min06Baseline and progress viewsA Gantt chart makes activity timing visible. The approved baseline supplies the reference for control. Cumulative S-curves connect time with cost, labor or quantities, while early and late plans expose a cash-flow and recovery-margin trade-off.8 min07Compression and crashingFast tracking changes overlap. Crashing adds resources or intensity. Both require a management trade-off, and neither helps the finish unless it shortens the controlling work. The live Q&A explains why multiple critical paths can require combinations of crash actions.9 minThe executable-schedule reviewReview the chain from scope to timing, then connect float, baseline control and compression to the management decisions they support.Summary