Planning & Controls · 5 November recording reference
Glossary
Short definitions as the module uses them, each linked to the lesson it comes from.
- Executable schedule
A delivery model whose activities are defined, connected, resourced, timed and checked against realistic conditions.
Review Lesson 1- Work Breakdown Structure (WBS)
The structure that organizes the full project scope into manageable work.
Review Lesson 1- Work package
The lowest manageable part of the WBS, with a clear deliverable, owner, budget and responsibility.
Review Lesson 1- Activity
A specific measurable action required to complete a work package.
Review Lesson 1- Hard logic
An actual dependency that requires an order of work, such as submitting an exam before it is graded.
Review Lesson 2- Soft logic
A preferred sequence that may be changed if another method of execution is workable.
Review Lesson 2- False logic
A relationship that does not reflect actual delivery, such as linking unrelated activities to manipulate dates.
Review Lesson 2- Finish-to-start (FS)
A relationship in which the predecessor must finish before the successor can start, subject to any stated lag or lead.
Review Lesson 2- Start-to-start (SS)
A relationship constraining the successor's start by the predecessor's start, allowing appropriate overlap.
Review Lesson 2- Finish-to-finish (FF)
A relationship in which the successor cannot finish before the predecessor finishes, subject to any offset.
Review Lesson 2- Start-to-finish (SF)
A relationship in which the predecessor's start controls the successor's finish, illustrated by shift coverage.
Review Lesson 2- Lag
A waiting interval between connected activity events.
Review Lesson 2- Lead
A negative lag that allows a controlled overlap between linked activities.
Review Lesson 2- Hard constraint
An imposed timing requirement such as must finish on that needs a defensible delivery reason.
Review Lesson 2- Productivity
The output achieved by a resource or crew per unit of time; the rate must match the estimate's availability basis.
Review Lesson 3- Critical path
The longest dependent path controlling project duration in the simple unconstrained CPM model used in the session.
Review Lesson 4- Near-critical path
A path with little remaining float that could soon become controlling.
Review Lesson 4- Risk path
A path exposed to disruption that could become controlling even if its current calculation contains substantial float.
Review Lesson 4- Forward pass
Analysis from project start toward finish to calculate early start and early finish dates.
Review Lesson 4- Backward pass
Analysis from the selected finish requirement backward to calculate late finish and late start dates.
Review Lesson 4- Total float
Permitted delay without moving project completion or the relevant required milestone, under the schedule's assumptions.
Review Lesson 5- Free float
Permitted delay without affecting the successor's early start.
Review Lesson 5- Negative float
A calculated indication that the current schedule cannot meet a required date or constraint.
Review Lesson 5- Baseline
The approved schedule used as a reference when comparing actual progress and forecasts.
Review Lesson 6- Gantt chart
A horizontal-bar view of activities against time that helps show duration, overlap and progress.
Review Lesson 6- S-curve
A cumulative measure such as cost, labor hours or quantities plotted over time; its units determine what the curve says.
Review Lesson 6- Fast tracking
Schedule compression by overlapping activities previously planned in sequence, with potential rework and coordination risk.
Review Lesson 7- Crashing
Schedule compression by adding resources or work intensity to feasible controlling work, usually at increased direct cost.
Review Lesson 7