Project Planning, Scheduling and Controls - FA26-27 · Course resources
Keep the foundations, calculations and resource decisions close
Connect the project idea and its boundaries to network logic, dates, floats, schedule confidence, resource demand and capacity. Study critical chain buffers and bottlenecks in Week 5. Review the class recordings from planning and control to resource allocation, leveling and smoothing.
Week 1 follows Summary_Week 1.docx. Project Planning follows Project_Planning_Summary (1).pptx. The scheduling assignment follows FadiZahhar_Assignment_ProjectScheduling.docx and FadiZahhar_LearningGuide_ProjectScheduling.pdf. Probabilistic Schedule Analysis follows Week 3_ Probabilistic Schedule Analysis.pptx. The resource allocation path follows Resource Allocation, Leveling and Smoothing.pdf and its companion PPTX. Week 5 follows Week 5_Summary.docx on Critical Chain Project Management. The session paths follow the supplied recordings dated 29 October, 5 November, 12 November and 19 November 2026. Each source guide maps the explanations to its supplied material and identifies assumptions and teaching additions.
Week 1
Week 1 · Introduction to Project Management
Source guide
Trace the explanations to the supplied sources and review the assumptions and distinctions that need careful reading.
What to keep from Week 1
A project needs a defined result, a plan for delivering it and attention to performance while the work is happening. Week 1 connects those needs to the life cycle, project constraints, a WBS, clear scope and two foundational documents. Use Listen for the narrated review.
Apply Week 1 to a small registration application
A hypothetical teaching case takes one project from high-level authorization through scope, a work breakdown, a change request and closure. Use it to explain the Week 1 decisions in context.
Glossary
Check a definition, then follow its link back to the lesson where the idea is explained.
Scenarios and knowledge check
Apply the concepts to project decisions, then review the explanation for each answer.
Sources and method references
Summary_Week 1.docx
The supplied summary of the Introduction to Project Management Week 1 lecture; the sole course-content source for this week.
Where 13 body paragraphs after the title
Project planning
Project Planning · WBS and Scope Management
Source guide
Trace the explanations to the supplied sources and review the assumptions and distinctions that need careful reading.
What to keep from project planning
A project needs a clear result, traceable requirements, manageable work and an approved reference for delivery and change. Monitoring becomes control when the team analyzes deviations and acts. Use Listen for the narrated review.
Glossary
Check a definition, then follow its link back to the lesson where the idea is explained.
Scenarios and knowledge check
Apply the concepts to project decisions, then review the explanation for each answer.
Sources and method references
Project_Planning_Summary (1).pptx
The supplied twelve-slide Project Planning: Planning, WBS and Scope Management summary by Farah Demachkieh, Ph.D. This path covers the complete deck.
Where Slides 1–12
Assignment project
Assignment · Project Scheduling and Network Analysis
Source guide
Trace the explanations to the supplied sources and review the assumptions and distinctions that need careful reading.
Explain the schedule, then check its limits
The five completed networks show how dependencies control dates, how float differs across activities and why overlap changes the calculation. A separate guide example introduces PERT, probability and monetary value using explicit invented inputs. Use Listen for the narrated review.
Glossary
Check a definition, then follow its link back to the lesson where the idea is explained.
Scenarios and knowledge check
Apply the concepts to project decisions, then review the explanation for each answer.
Sources and method references
FadiZahhar_Assignment_ProjectScheduling.docx
Fadi Zahhar's completed analysis dated 11 November 2026; supplies the five result tables, reproduced networks, assumptions and calculations.
Where Exercises 1–5; Calculation conventions; Calculation method and references
FadiZahhar_LearningGuide_ProjectScheduling.pdf
Companion explanation dated 11 November 2026; includes the separate invented PERT, probability and financial example.
Where 15 pages
GAO Schedule Assessment Guide (2015) (opens in a new tab)
Method reference R1 named in the learning guide for schedule quality, critical paths, risk and maintenance.
Where Guide references p. 15; cited printed pp. 30–31, 75–97, 99–119 and 121–146
Understanding the basics of CPM calculations (2006) (opens in a new tab)
Kramer and Jenkins PMI conference paper; method reference R2 named by both sources.
Where Forward Pass, Backward Pass and Float Calculations sections, as cited in the supplied sources
GPM and forensic total float (2010) (opens in a new tab)
Ponce de Leon PMI conference paper; method reference R3 for the float distinctions.
Where Compendium of CPM and GPM Floats section, as cited
Oracle Primavera P6 About Relationships (2024) (opens in a new tab)
Method reference R4 named by both sources for FS, SS, FF, SF and lag.
Where Definitions cited by the supplied sources
Leveraging the new practice standard for project estimating (2011) (opens in a new tab)
Kanabar and Warburton PMI conference paper; guide reference R5 for three-point formulas.
Where Three-point formulas, as cited in the guide
Project schedule risk analysis: Monte Carlo simulation or PERT? (2000) (opens in a new tab)
Hulett, PM Network 14(2), 43–47; guide reference R6 for path calculations and merge risks.
Where Guide references p. 15
NIST Standard Normal Cumulative Distribution Function (opens in a new tab)
Guide reference R7 for the hypothetical probability calculation.
Where NIST/SEMATECH e-Handbook section 1.3.6.7.1, as cited
Decisions, decisions (2005) (opens in a new tab)
Stefanovic and Stefanovic PMI conference paper; guide reference R8 for expected monetary value.
Where Expected Monetary Value section, as cited
PMI Practice Standard for Scheduling, second edition (2011) (opens in a new tab)
Formal standard named as R9 by both sources; distinct from the practitioner conference papers.
Where Assignment cites sections 2.2.1, 2.2.2, 2.3.3, 2.3.4 and 3.3; guide cites p. 16 and pp. 33–34
Week 3 · Source study path
Week 3 · Probabilistic schedule analysis
Source guide
Trace the explanations to the supplied sources and review the assumptions and distinctions that need careful reading.
A completion forecast with its assumptions visible
Review the source's calculations and distinguish the uncertainty in an activity, a fixed path and the complete project. Use completion confidence to support an explained schedule decision. Use Listen for the narrated review.
Glossary
Check a definition, then follow its link back to the lesson where the idea is explained.
Scenarios and knowledge check
Apply the concepts to project decisions, then review the explanation for each answer.
Sources and method references
Week 3_ Probabilistic Schedule Analysis.pptx
Supplied eighteen-slide Week 3 deck by Farah Demachkieh, Ph.D., for Project Planning, Scheduling and Controls. Text, tables, equations and all six native chart data sets support this study path.
Where Slides 1–18, including the native charts on slides 4, 5, 7, 14 and 17
Resource planning
Resource Allocation, Leveling and Smoothing
Source guide
Trace the explanations to the supplied sources and review the assumptions and distinctions that need careful reading.
What to keep from resource allocation
Resource planning joins ownership, the timing of demand and the limits of supply. A good decision makes clear which constraint it protects and verifies the whole revised schedule. Use Listen for the narrated review.
Glossary
Check a definition, then follow its link back to the lesson where the idea is explained.
Scenarios and knowledge check
Apply the concepts to project decisions, then review the explanation for each answer.
Sources and method references
Resource Allocation, Leveling and Smoothing.pdf
The supplied 56-page course deck by Farah Demachkieh, Ph.D., for Project Planning, Scheduling and Controls. It supplies the detailed examples and calculations in this study path.
Where PDF pp. 1–56
Resource Allocation, Leveling and Smoothing.pptx
The supplied twelve-slide companion by Farah Demachkieh, Ph.D. It summarizes the resource types, worker-capacity and compressor examples, and adds a short engineer allocation/loading example and a clear construction RACI table. It is integrated into this path rather than duplicated as a separate module.
Where Slides 1–12
Week 5
Week 5 · Critical Chain Project Management
Source guide
Trace the explanations to the supplied sources and review the assumptions and distinctions that need careful reading.
What to keep from Week 5
CCPM brings task uncertainty and resource constraints into the same scheduling discussion. Keep the delay mechanisms, buffer roles, bottleneck focus and portfolio drum distinct. Use Listen for the narrated review.
Explain CCPM through a shared review resource
A hypothetical teaching case connects resource conflicts, the three buffer roles and a portfolio drum. It illustrates the concepts without inventing a numerical scheduling method.
Glossary
Check a definition, then follow its link back to the lesson where the idea is explained.
Scenarios and knowledge check
Apply the concepts to project decisions, then review the explanation for each answer.
Sources and method references
Week 5_Summary.docx
The supplied summary titled “Summary of Week 5: Critical Chain Project Management (CCPM).” It is the sole course-content source for this study path.
Where 23 nonempty document paragraphs, including the title and section headings
Live session · 29 October 2026
29 October · Planning, WBS and scope
Source guide
Trace the explanations to the supplied sources and review the assumptions and distinctions that need careful reading.
The agreed work becomes your reference
The session connects project purpose to a manageable scope, an approved reference and decisions informed by performance. Good planning gives direction and a systematic response to problems; it does not promise a problem-free project. Use Listen for the narrated review.
Glossary
Check a definition, then follow its link back to the lesson where the idea is explained.
Scenarios and knowledge check
Apply the concepts to project decisions, then review the explanation for each answer.
Sources and method references
Farah Demachkieh-20261029 1657-1.mp4
First live session: Week 1 review of planning, WBS and scope, followed by participant discussion. Source duration: 53m24s.
Where 29 October 2026 recording
Class recording · 5 November 2026
5 November · Executable schedules and control
Source guide
Trace the explanations to the supplied sources and review the assumptions and distinctions that need careful reading.
The executable-schedule review
Review the chain from scope to timing, then connect float, baseline control and compression to the management decisions they support. Use Listen for the narrated review.
Glossary
Check a definition, then follow its link back to the lesson where the idea is explained.
Scenarios and knowledge check
Apply the concepts to project decisions, then review the explanation for each answer.
Sources and method references
Farah Demachkieh-20261105.mp4
Second live session for Project Planning, Scheduling and Controls, including the full scheduling recap and learner Q&A. Recording dated 5 November 2026; duration 44 minutes 47 seconds.
Where Complete supplied recording
Class recording · 12 November 2026
12 November · Probabilistic schedule analysis
Source guide
Trace the explanations to the supplied sources and review the assumptions and distinctions that need careful reading.
From an uncertain duration to an explained commitment
A sound completion forecast connects relevant data, sensible distribution assumptions and correct schedule logic. PERT can clarify an activity or fixed path, while Monte Carlo explores the whole network across many outcomes. Percentiles make the risk behind a proposed date visible. Use Listen for the narrated review.
Glossary
Check a definition, then follow its link back to the lesson where the idea is explained.
Scenarios and knowledge check
Apply the concepts to project decisions, then review the explanation for each answer.
Sources and method references
Farah Demachkieh-20261112 1649-1.mp4
Supplied 46-minute, 57-second class recording. The lecturer calls its main material Week 3: probabilistic schedule analysis. The latter part includes learner questions about this material and earlier network methods.
Where Complete recording; ten chronological raw-transcript paragraphs
Class recording · 19 November 2026
19 November · Resource allocation, leveling and smoothing
Source guide
Trace the explanations to the supplied sources and review the assumptions and distinctions that need careful reading.
A feasible plan connects work, capacity and a clear trade-off
Allocate the work, add the loads in each period and check them against the right resource limit. Use flexibility and priority rules carefully, distinguish smoothing from leveling, and explain the actual finish-date and cost consequences of the proposed plan. Use Listen for the narrated review.
Glossary
Check a definition, then follow its link back to the lesson where the idea is explained.
Scenarios and knowledge check
Apply the concepts to project decisions, then review the explanation for each answer.
Sources and method references
Farah Demachkieh-20261119 1636-1.mp4
Supplied fourth live session, dated 19 November 2026 and introduced by the lecturer as Week 4. Covers resource allocation, leveling and smoothing, with finance, cost and AI-productivity Q&A.
Where Complete 31-minute, 19-second recording; seven chronological raw-transcript paragraphs