Planning & Controls · 19 November session reference

Glossary

Short definitions as the module uses them, each linked to the lesson it comes from.

Resource allocation

Assigning a resource to an activity and estimating the effort or units it needs.

Review Lesson 1
Resource loading

Adding a resource’s assigned demands in each period so they can be compared with availability.

Review Lesson 1
Resource overload

Demand above a resource’s available capacity in a relevant period.

Review Lesson 1
Renewable resource

A resource whose capacity is available again in subsequent periods, such as crew working hours.

Review Lesson 1
Non-renewable resource

A limited stock consumed by the work within the planning boundary, such as the example’s steel beams.

Review Lesson 1
Doubly constrained resource

A resource arrangement needing both a period-capacity check and a cumulative consumption check.

Review Lesson 1
Work Breakdown Structure (WBS)

The breakdown identifying the project work that must be assigned and planned.

Review Lesson 2
Organizational Breakdown Structure (OBS)

The organizational structure identifying the teams and people who can be connected to work responsibilities.

Review Lesson 2
RACI

Responsible, Accountable, Consulted and Informed: roles used to connect work items with people and teams.

Review Lesson 2
Worker-week

An effort unit representing one person’s work for one week under the example’s working assumptions.

Review Lesson 3
Time-phased capacity

The available resource capacity organized by the periods in which work needs it.

Review Lesson 3
Total float

The scheduling flexibility available without delaying the project finish under the current model’s assumptions.

Review Lesson 3
Priority rule

A practical basis for choosing which ready activity receives a scarce resource, such as lower total float or waiting successors.

Review Lesson 3
Resource smoothing

Adjusting activity timing within available flexibility while preserving the planned project finish.

Review Lesson 5
Resource leveling

Adjusting the schedule to respect resource availability, potentially changing activity dates and the project finish.

Review Lesson 5
Added capacity

An approved change in available resources, such as another machine, a suitable additional worker or another shift.

Review Lesson 5
Time-related cost

A cost whose amount can change with the duration, such as continuing supervision, rental or overhead in the class discussion.

Review Lesson 6
Resource cost

The cost of the people, equipment or other resources actually used, including changes such as hiring or an extra shift.

Review Lesson 6
Productivity assumption

An estimate of output relative to resource effort that needs relevant evidence before it is used to change a schedule.

Review Lesson 7
Token budget

The allocation for model or agent usage raised in the AI discussion as a resource and cost consideration.

Review Lesson 7