Agentic AI in Practice · Module 06

Module 6 · The Responsibility Layer

A governed agent: it owns the route, you own the policy.

Five short lessons on letting an agent choose its own steps without letting it choose its own rules. Give it one goal and a small named tool set, design the boundary before you build, turn written policies into a checkpoint with two answers, keep drafting, auditing and permission apart, and prove it stops before it gets a clock.

  • Goal and tool boundary
  • Tool contracts
  • Governance checkpoint
  • Three separate roles
  • Prove the stop

Module introduction

Let it choose the route. Keep the policy.

Module 5 built a fixed scenario: Make owned the route, and the AI only wrote text. Module 6 hands the route to an agent. In the prompt library’s build, a Make AI Agent reads each new weekly update and decides whether it needs a Google Doc, a calendar event or both. What keeps that safe is not the agent’s judgment but the boundary around it: four named tools, an independent audit, a governance checkpoint built from four written policies, and one rule above all. Needs Approval always means nothing gets created.

The governed agent’s required order · Module 6 prompt library pp. 4, 9-12
  1. TriggerWatch New RowsOne new weekly update in the Governed Weekly Updates Sheet.
  2. The agentDraftA plain-text summary, and a calendar proposal or NONE.
  3. Scenario tool 1Audit Executive Brief Against SourcePASS, NEEDS CORRECTION or NEEDS HUMAN. At most three calls.
  4. Scenario tool 2Check Governance Before ActionOnce per proposed action: Allowed or Needs Approval.
  5. Module toolsCreate the Doc, then the eventOnly if every governance decision is Allowed. Locked folder, locked calendar, no guests.

The agent chooses its route inside this order. Any Needs Approval stops delivery entirely: nothing gets created.

Your learning path

Five short lessons, then one agent that proves it stops.

Open source guide
01Goal and tool boundaryMaking something an agent is a boundary decision, not a design flourish. Name one goal and the smallest set of tools it needs, and sort them into tools that only check and tools that create something real.10 min02Design before you buildAn Agent Build Brief fixes the goal, the four tools, the order they must run in and the stop rule before any tool exists. Then four tool contracts name every input and output, so a second person can check the build.12 min03Policies become a toolA policy that lives only in a document doesn’t stop anything. Compile four written policies, goal, access, approval and escalation, into one governance tool that answers with exactly two values: Allowed or Needs Approval.13 min04Three separate rolesThe agent drafts, an independent Auditor checks accuracy against the source, and a separate Governance tool decides permission. Merge any two and an accurate-but-unauthorized action, or an unchecked draft, gets through.12 min05Prove the stopA governed agent is not proven by one convenient run. Three tests, a document and an event, a document only, and a request that must be stopped, show that the agent chooses tools and really stops, before any schedule turns on.12 minWhat you keep from Module 6Each part in one line, the five Mental Model cards, and the deliverable bundle.SummaryHands-on: Lina’s governed brief agentThe eight-prompt chain: the Build Brief, four tool contracts, the Auditor, Governance and agent instructions, and three tests.Hands-on