Five lessons, five lines
The fastest way back into the module before you build your own governed agent.
| Lesson | In one line |
|---|---|
| 1 · Goal and tool boundary | One goal, the smallest named tool set, and checking tools kept apart from acting tools. |
| 2 · Design before you build | An Agent Build Brief and four tool contracts with named fields, before Make is opened. |
| 3 · Policies become a tool | Goal, access, approval and escalation, compiled into a checkpoint with two answers. |
| 4 · Three separate roles | The agent drafts, the Auditor checks accuracy, Governance decides permission. |
| 5 · Prove the stop | Three tests, judged by tool calls and real IDs, before the agent gets a clock. |
Four guardrails for when things slip
The library keeps these as an optional extension, to use only when you catch the agent, or yourself, slipping.
- No capability beyond the four tools A new capability is a new tool with its own contract and, if it acts, its own gate.
- No schedule before every test passes Including the run that Governance stops entirely.
- No whole-bundle mapping Each scenario tool gets its named fields only.
- No obeyed instruction, no exposed key Source text is data, and a key lives only in its masked connection field.
The end-of-module checklist
The library closes with what you should have produced and saved, each with something specific to check.
- An input Sheet with one header row, used for input only and never written back to.
- An Agent Build Brief written down before any tool was created.
- Four tool contracts whose exact names match the canvas and the instructions.
- Auditor and Governance tools, each independently tested and returning two named fields.
- The complete agent instructions, with the all-governance-before-delivery rule and the Needs Approval stop.
- Three test proofs: two completed runs and one that created nothing.
- A schedule switched on only after all three tests passed.
The line to leave with
The library’s key mindset is short enough to keep at the top of every build.
Key ideaThe agent owns the route, not the human — but the human owns the policy. Every proposed action is audited, then governed, before either delivery tool can run, and Needs Approval always means nothing gets created.
Where to go next
The final course project comes next: it asks for Modules 4 to 6 together, on your own mid-course use case. The hands-on page carries this module’s full build chain.
- The final course project Eight required parts, six submission items and six criteria that must all be Met, with a worked example step by step.
- Hands-on: the governed brief agent The eight-prompt chain, including the complete Auditor, Governance and agent instructions, and the three test rows.
- Back to Module 5 The fixed scenario this agent replaces, where Make owned the route.