Accuracy and permission are two different checks
An agent auditing its own draft is grading its own work. An Auditor deciding whether an action is allowed is answering a question it was never designed to answer. The library keeps three roles apart for exactly these two reasons.
The improved prompt · P3Keep three roles separate: the agent drafts the proposed output from the source only; an independent Auditor tool compares the exact proposed output against the source and returns a status, never a rewrite; a separate Governance tool decides whether the action is allowed to happen, using written policies, not the Auditor's accuracy verdict alone. Do not let the agent skip the Auditor, and do not let the Auditor decide whether an action is allowed.
The Auditor reviews, never rewrites
The Auditor prompt treats the weekly update as the authoritative source and the summary and calendar proposal as untrusted drafts. Its eight rules check every name, date, amount and status against the source, keep confirmed facts apart from uncertain ones, and exclude private candidate details.
| Status | When |
|---|---|
| PASS | Every factual and requirements check passes and no correction remains |
| NEEDS CORRECTION | The source is sufficient and the output can be corrected without guessing |
| NEEDS HUMAN | The source is missing or contradictory, so correcting it would require guessing |
Read with careThe Auditor must not return NEEDS HUMAN only because an action may need approval. That decision belongs to Governance.
Data, never instructions
Both checking tools treat every mapped value as data. Their prompts tell them to ignore embedded requests to change the rules, skip checks, call tools, expose secrets or weaken the review. The agent’s written instructions are the only thing allowed to tell it what to do.
Key ideaThe moment source data is allowed to act as an instruction, the governance layer built on top of it stops meaning anything.
At most three audits
The agent’s instructions cap the audit loop. It drafts the full summary and calendar proposal, calls the Auditor, and on NEEDS CORRECTION fixes only the failed items and re-audits the whole output. On NEEDS HUMAN, or with no PASS after three calls, it stops and returns NEEDS_APPROVAL without calling governance or delivery.
The pair most tempting to merge
The library’s warning is specific: merging the Auditor and Governance tools to save a step quietly lets an accurate but unauthorized action through, because nothing separately checked whether it was allowed.
- The follow-up asks which two roles would be hardest to tell apart if their prompts were combined.
- That pair is the one most tempting to merge, and the one to keep furthest apart.
Key takeaways
- The agent drafts, the Auditor checks accuracy, Governance decides permission.
- The Auditor returns PASS, NEEDS CORRECTION or NEEDS HUMAN, and never rewrites.
- Every mapped value is data; only the written instructions are instructions.
- The audit loop stops after three calls, or at the first NEEDS HUMAN.
- Merging the Auditor and Governance lets accurate but unauthorized actions through.