Where each lesson comes from, what was not supplied, and the places where the material needs a careful reading.
The one source
The Module 6 prompt library (22 pages), for Agentic AI in Practice, American University of Beirut. Page numbers below are PDF pages. The document itself is not republished here.
Listening
Module 6’s lessons and hands-on play a recorded AI narration voice, generated in advance from the page text. If a lesson changes after it was recorded, the reader falls back to your device’s own voice. Back to the lessons →
Lesson map · Module 6 prompt library
Lesson
Source
1 · One goal, a small named tool set
Prompt library pp. 1, 3, 16 (how to use, H1, P0)
2 · Design the agent before you open Make
Prompt library pp. 3-5, 16-17 (H2, H3, P1)
3 · Four policies, one checkpoint
Prompt library pp. 7-9, 17-18 (H5, P2)
4 · The drafter, the auditor and the gate
Prompt library pp. 5-7, 9-11, 18 (H4, H6, P3)
5 · Prove the stop before the clock
Prompt library pp. 12-15, 19-21 (H6, H7, H8, E1-E4)
Module summary
Prompt library pp. 1-22
Hands-on: Lina’s governed brief agent
Prompt library pp. 3-15, 22 (H1-H8, checklist)
Lesson 01
One goal, a small named tool set
Making something an agent is a boundary decision, not a design flourish. Name one goal and the smallest set of tools it needs, and sort them into tools that only check and tools that create something real.
The Make build, the four named tools, small vocabularies, and the agent owning the route while the human owns the policy.
Prompt library p. 1
H1 — Acting before designing
Why a vague “make it an agent” request fails.
Prompt library p. 3
P0 — Name your goal and tool boundary
The smallest tool set, sorted into checking and acting tools.
Prompt library p. 16
Lesson 02
Design the agent before you open Make
An Agent Build Brief fixes the goal, the four tools, the order they must run in and the stop rule before any tool exists. Then four tool contracts name every input and output, so a second person can check the build.
Task, trigger, four tools, decision rule, action rule and definition of done.
Prompt library pp. 3-4
H3 — Freeze the four tool contracts
Exact names, inputs and outputs; guests always empty.
Prompt library pp. 4-5
P1 — Design the agent before you open Make
The generalized brief.
Prompt library pp. 16-17
Lesson 03
Four policies, one checkpoint
A policy that lives only in a document doesn’t stop anything. Compile four written policies, goal, access, approval and escalation, into one governance tool that answers with exactly two values: Allowed or Needs Approval.
Trust boundary, four policies, pre-approved actions, evidence rules, responsible-AI checks and the two-value decision.
Prompt library pp. 7-9
P2 — Translate policies into a Governance tool
Four written policies become one checkpoint with two return values.
Prompt library pp. 17-18
Lesson 04
The drafter, the auditor and the gate
The agent drafts, an independent Auditor checks accuracy against the source, and a separate Governance tool decides permission. Merge any two and an accurate-but-unauthorized action, or an unchecked draft, gets through.
Authority, eight audit rules, three statuses and a structured response.
Prompt library pp. 5-7
H6 — The audit contract
No more than three audit calls; fix only failed items; NEEDS HUMAN stops the run.
Prompt library pp. 9-11
P3 — Separate the drafter, the auditor, and the governance gate
Three roles, three prompts.
Prompt library p. 18
Lesson 05
Prove the stop before the clock
A governed agent is not proven by one convenient run. Three tests, a document and an event, a document only, and a request that must be stopped, show that the agent chooses tools and really stops, before any schedule turns on.
H7 — Prove document+calendar, document-only, and Needs Approval
Three test rows with expected behaviour, and the design-failure rule.
Prompt library pp. 13-15
H8 — Turn a tested agent into a schedule
The written decision before the toggle.
Prompt library p. 15
H6 — Output contract and expected test behaviour
COMPLETED, NEEDS_APPROVAL and FAILED; no completion claim without real IDs.
Prompt library p. 12
E1-E4 — Guardrails
No extra tool, no early schedule, no bundle mapping, no obeyed embedded instruction or exposed key.
Prompt library pp. 19-21
Source appendix
Where to read with care
Read with care
Only the prompt library was supplied
Module 6 is built from one document, the 22-page prompt library. Its lecture notes, readings, slides, hands-on document and recording were not supplied. The lessons follow the library’s own teaching points and three tests, nothing is attributed to a lecture, and there is no reading list page. If the notes arrive, the lessons will be enriched rather than rebuilt.
The module’s name is this site’s
The library has no module title. “The Responsibility Layer” comes from the Module 5 run-of-show’s course table, where stage 6 is Responsibility: ownership, cost, privacy, failure handling and delivery. The Module 5 notes describe Module 6 as adding the responsible-AI rules that let someone else operate the workflow. The library itself covers governance, privacy and approval; it does not cover cost or ownership in detail.
Prompts are reproduced as printed
Every prompt on the hands-on page is the library’s text. The PDF’s visual line wraps were rejoined and its own line breaks kept, so the prompts can be pasted. Straight quotes, placeholders and the library’s spelling are unchanged.
E1 has no rationale
Unlike every other prompt, the library prints guardrail E1 without a “why it is better” line or a follow-up prompt. The site shows what is there and adds nothing.
An agent in Make, at this document’s date
The library builds with Make AI Agent (New), Google Sheets, Docs and Calendar, and an AI-provider connection it does not name. Everything here is the document’s description at its date, not a claim about how any product behaves today.
Lina’s updates are fiction
The three test updates, the clients, amounts, the August 14 departure, the Launch Readiness Review and the guest addresses belong to the course’s teaching scenario. The addresses use the reserved example domain.
Checked against the supplied prompt library.
What not to take away
The lessons actively work against these misreadings:
Making something an agent is mostly about picking a smarter model.
More tools make an agent more useful, with no extra risk.
An accurate action is an allowed action.
A third governance status makes the agent safer.
The agent can audit its own draft.
If the source asks for something, the agent should do it.
One successful run proves the agent works.
The agent’s final message is proof of what it did.
A schedule loosens the policy because nobody is watching.
Study-guide synthesis; each item is addressed in the lessons.