Agentic AI · Module 5 · Reading
Further reading
The course's own curated list for automation systems and agents, reproduced with what each source is for and which part of it to read. Every link is the module's recommendation, not this library's.
The list carries its own caveat about links: web pages move and get renamed over time, so if a link doesn’t resolve, search the title in quotes — the resource is usually easy to find under the same name. Links open in a new tab. They were taken from the supplied reading list and have not been assessed here.
Core readings
Read these after the lecture. The list calls them the minimum supporting readings, written for a general, non-technical audience, and estimates 50 to 65 minutes in total if you read only the sections noted. Its own framing: the goal is to see what an agentic workflow actually is, what an agent is built from, and where the wider automation landscape sits around it, not to read every source end to end.
IBM — What Are Agentic Workflows? (opens in a new tab)
The core distinction the module is built on: a fixed workflow follows steps you defined, while an agentic workflow lets an AI system plan, decide and adjust those steps itself as it works toward a goal.
Read this part Read the definition and the section contrasting agentic workflows with traditional automation; skim the industry examples.
IBM — What Are AI Agents? (opens in a new tab)
A general-audience explanation of what makes something an agent rather than a chatbot or a script: perception, reasoning and action working together toward a goal.
Read this part Read “How do AI agents work?” and the types-of-agents section; skip the deployment and vendor-platform sections.
IBM — Components of AI Agents (opens in a new tab)
The list’s clearest general-audience breakdown of the same anatomy the module teaches: goal, reasoning engine, planning, memory and tools, piece by piece.
Read this part Read it straight through. The list says it is short, and every section maps onto a component in the anatomy of an agent.
WeWeb — The Ultimate Guide to Automation Tools (opens in a new tab)
A practical map of the no-code automation landscape, where Make, Zapier and n8n each fit, and context for why the course builds in Make.
Read this part Read the comparison section and the notes on choosing a tool; skip any sections about WeWeb’s own product.
Datadog — What Is Workflow Automation? (opens in a new tab)
Trigger-action automation from the monitoring side: why knowing what ran, what it touched and where it failed, the module’s Log and Approval, matters once an automation runs unattended.
Read this part Read how workflow automation works and its core benefits; skip the Datadog-specific sections.
Practical references
Use these while you build and run your automation in Make.com. The list calls them the how-tos for the tool this course actually uses, from connecting your first app to adding a real AI Agent module.
Make — Connect an Application (opens in a new tab)
The first practical step before any scenario can run: authorizing Make to talk to an app or account you actually use.
Read this part Read the steps for adding a new connection, and do it once for each app your scenario needs before you start building.
Make — Types of Modules (opens in a new tab)
The on-canvas version of the module’s five-part vocabulary: trigger, search, action, iterator and aggregator modules are how Make represents Trigger, Condition and Action.
Read this part Read the overview of each module type; skip the ones you won’t need until you build something more advanced.
Make — Types of Modules: Actions (opens in a new tab)
A targeted revisit of Practical 2, focused only on action modules: the module’s Action part, in Make’s own words.
Read this part Read just the Actions section; you covered the rest of the page in Practical 2.
Make — Introduction to Make AI Agents (opens in a new tab)
Make’s own AI Agent module, where a scenario stops following a fixed script and starts making its own decisions inside the same canvas.
Read this part Read the overview of what the AI Agent module does and how it differs from a normal scenario, when you are ready to add real autonomy to something you have already built.
Optional deeper dives
Useful, and deliberately not required for the quiz or the deliverables. Use them only after the core readings.
ReAct: Synergizing Reasoning and Acting in Language Models (opens in a new tab)
The research behind the module’s reasoning trace and its failure modes. The paper’s error analysis shows a reasoning loop misreading what it observed, hallucinating a fact or repeating an ineffective action instead of stopping.
Read this part Read the thought, action and observation loop in the introduction and the error-analysis section; skip the benchmark tables.
OpenAI — A Practical Guide to Building Agents (opens in a new tab)
Fills the gap the list says Make’s AI Agent module leaves: agent design itself, with the same goal, brain, planning, memory and tools breakdown, plus guardrails.
Read this part Read the sections on when to build an agent and on guardrails; treat the orchestration code as illustrative only.
Anthropic — Agentic Misalignment (opens in a new tab)
A research look at how an agent pursuing a goal can act against the intent behind it under pressure. The list calls it the far end of misread intent, and the strongest case for guardrails and a human checkpoint.
Read this part Read the summary and the why-this-matters framing; the experiment details are not required.
LangChain — Agents (Conceptual Guide) (opens in a new tab)
A more technical look at how an agent’s reasoning loop is implemented in code: the machinery behind the trace and the failure modes.
Read this part Read the conceptual overview of the agent loop and tool calling; treat the code samples as illustrative, not a specification.
Where each one helps
Readings, mapped to the module.
| Module stop | Best supporting reading |
|---|---|
| How much rope? The autonomy ladder; from workflows to agents | Core 1 (agentic versus fixed workflows); Core 2 (what makes something an agent) |
| What to automate and the no-code tools | Core 4 (the automation-tool landscape); Practical 1-2 (connecting an app; module types in Make) |
| Name the parts: Trigger, Action, Condition, Approval, Log | Core 5 (trigger and action from the monitoring side); Practical 2-3 (module types and actions in Make’s own words) |
| The anatomy of an agent; guardrails | Core 3 (goal, brain, planning, memory, tools); Practical 4 (Make’s AI Agent module); Optional 2 (the same breakdown, plus guardrails) |
| How agents fail differently; the reasoning trace | Optional 1 (ReAct’s failure analysis); Optional 3 (why guardrails matter under pressure); Optional 4 (the loop’s machinery) |
| Stop | Lesson |
|---|---|
| How much rope? and From workflows to agents | 1 · How much rope? and 4 · From workflows to agents |
| What to automate and the no-code tools | 2 · What to automate, and the hands-on |
| Name the parts | 3 · Name the five parts |
| The anatomy of an agent; guardrails | 5 · The anatomy of an agent |
| How agents fail differently; the reasoning trace | 4 · From workflows to agents and 5 · The anatomy of an agent |
Read with careThe readings group the module into five stops that don’t match the notes’ five parts one to one, so two stops each land on two lessons.