Original source guide

Module 5: Automation Systems & Agents — The Automation Layer

Where each lesson comes from, what was not supplied, and the places where the material needs a careful reading.

The four sources

The Module 5 lecture notes (6 pages), the Module 5 additional readings (4 pages), the hands-on concept and narrator run-of-show (25 pages) and the Module 5 prompt library (14 pages), for Agentic AI in Practice, American University of Beirut. Page numbers below are PDF pages. The documents themselves are not republished here.

Listening

Module 5’s lessons and hands-on play a recorded AI narration voice, generated in advance from the page text. If a lesson changes after it was recorded, the reader falls back to your device’s own voice. Back to the lessons

Lesson map · Module 5 lecture notes, reading list, hands-on run-of-show and prompt library
LessonSource
1 · How much rope?Lecture notes pp. 1-2 (opening, Part 1, the ladder, Card #21); readings pp. 1-2
2 · What to automateLecture notes pp. 2-3 (Part 2, the candidate test, the no-code tools, Card #22); readings p. 2
3 · Name the five partsLecture notes pp. 3-4 (Part 3, the five parts, Card #23); readings pp. 2-3
4 · From workflows to agentsLecture notes p. 4 (Part 4, the reasoning trace, Card #24); readings p. 3
5 · The anatomy of an agentLecture notes pp. 4-5 (Part 5, guardrails, failure modes, Card #25); readings pp. 2-4
Module summaryLecture notes p. 6
Hands-on: the weekly brief scenarioHands-on run-of-show pp. 1-25
Prompt libraryPrompt library pp. 1-14
Further readingAdditional readings pp. 1-4

Lesson 01

How much rope?

Autonomy is a dial, not an on and off switch. Four rungs, Assistant, Automation, Orchestrator and Agent, each do more without you. Match the task to the lowest rung that does the job.

Open the lesson
Module snapshot and opening

The power switch, the silent Sunday, and the automation layer on top of the workflow layer.

Lecture notes p. 1
Part 1 — How much rope?

Autonomy defined, why it matters, the four rungs and the four questions.

Lecture notes pp. 1-2
The trap and Card #21

An agent in a costume; match the task to the level.

Lecture notes p. 2
Agentic workflows and AI agents

The readings’ core distinction between a fixed workflow and one that plans its own steps.

Additional readings pp. 1-2, Core 1 and 2

Lesson 02

What to automate

Automate the repeatable, rule-based, frequent, low-judgment tasks, and leave the rare and high-judgment ones to a person. You don’t need code: the no-code tools turn trigger, actions, done into blocks you connect.

Open the lesson
Part 2 — What to automate

The candidate test and what not to automate.

Lecture notes pp. 2-3
Everyday candidates and the no-code tools

Six everyday candidates; Zapier, Make and n8n.

Lecture notes p. 3
Card #22

When to reach for automation.

Lecture notes p. 3
The automation landscape

The readings’ map of where Make, Zapier and n8n fit, and how to connect a first app in Make.

Additional readings p. 2, Core 4 and Practical 1

Lesson 03

Name the five parts

Every automation, however complex, is built from five parts. Trigger starts it, Action does it, Condition forks it, Approval pauses it, Log remembers it. Name them and you can read any automation on sight.

Open the lesson
Part 3 — Name the parts

The five parts as Module 4’s four moments renamed, plus approval.

Lecture notes p. 3
The five parts table and why naming matters

Trigger, action, condition, approval, log, with inbox examples; the missing-approval mistake.

Lecture notes p. 3
Card #23

Five words, any automation.

Lecture notes p. 4
Trigger and action, in practice

The monitoring view of trigger-action automation, and Make’s own module types.

Additional readings pp. 2-3, Core 5 and Practical 2-3

Lesson 04

From workflows to agents

A fixed workflow only ever does what you scripted. An agent is given a goal instead, and decides its own steps to reach it, inside limits you set. The moment it re-plans is what agentic means in practice.

Open the lesson
Part 4 — From workflows to agents

The ceiling of a fixed workflow; script versus goal.

Lecture notes p. 4
The reasoning trace

Thought, action, observation; the sold-out flight and the 8:30pm option.

Lecture notes p. 4
Characteristics, single and multi-agent, and Card #24

Five characteristics, one agent or a team, everyday agents.

Lecture notes p. 4
ReAct

The research behind the reasoning trace, in the optional readings.

Additional readings p. 3, Optional 1

Lesson 05

The anatomy of an agent

Five parts and a fence. Goal, Brain, Planning, Memory and Tools, wrapped in guardrails, describe every agent you will build or judge. Agents also fail in their own ways, because the failures come from the reasoning itself.

Open the lesson
Part 5 — The five components

Goal, brain, planning, memory and tools, with a finance agent.

Lecture notes pp. 4-5
Guardrails and how agents fail

The fence, the human key, and four failure modes.

Lecture notes p. 5
Card #25

The anatomy, and no unattended agent without an approval gate.

Lecture notes p. 5
Components of AI agents

The readings’ piece-by-piece breakdown of the same anatomy, plus Make’s AI Agent module and a guide to guardrails.

Additional readings pp. 2-4, Core 3, Practical 4 and Optional 2

Source appendix

Where to read with care

Read with care

The slides and the recording were not supplied

The notes describe themselves as a quick-revisit guide to read alongside slides, and the hands-on document is a narrator’s run-of-show for a recording. Neither the slides nor the recording was supplied, so nothing here is attributed to them.

The lessons teach agents; the hands-on builds none

Parts 4 and 5 of the notes teach agents, and the readings’ Practical 4 points to Make’s AI Agent module. The hands-on is explicit that it builds a fixed scenario: Tools stay empty and the AI never chooses the route. The site teaches both, and labels the scenario as a scenario. Module 6 is where an agent is built.

No approval module in the scenario

The notes call a skipped approval step the single most common mistake. The hands-on scenario has no separate approval module: it creates a Google Doc in a folder and sends nothing. Reading the Doc before it goes anywhere is this site’s description of where the human checkpoint sits, not a step the run-of-show names.

A presenter’s script, rewritten for a learner

The run-of-show is written for someone recording a demo: timings, cropping the screen before a key appears, presenter reset states. The hands-on page keeps every build step, setting, prompt and check, and the safety and billing notes, and leaves out instructions that only matter on camera.

The prompts appear twice, in two forms

The run-of-show prints the three OpenAI prompts as full, line-by-line text. The prompt library prints the same three, H4 to H6, condensed into running sentences. The hands-on page uses the run-of-show’s version; the prompt library page reproduces the library’s.

The tools, at these documents’ date

The notes name Zapier, Make and n8n and describe each in a phrase. The hands-on and the readings use Make, OpenAI, Google Sheets and Google Docs, and the run-of-show itself warns that interface labels move. Everything here is the documents’ description at their date, not a claim about how any product behaves today.

One repeated sentence in the trace

The notes’ reasoning trace gives the goal twice in one sentence, as booking a flight and as Friday’s 6pm flight. Lesson 4 follows the trace’s steps.

Module 6 is named, and built from its prompt library

The notes close by saying Module 6 adds the responsible-AI rules that let someone else operate the workflow. Its prompt library was supplied, and Module 6 in this library is built from that document alone.

The weekly update is fiction

The messy update, its clients, invoices, amounts and the August 14 departure, and Lina’s recommendation, belong to the course’s teaching scenario.

The links are the course’s, not ours

All thirteen reading links and the hands-on’s seven references were taken from the supplied PDFs’ own link annotations. None was added, substituted or assessed here.

Checked against the supplied notes, readings, run-of-show and prompt library.

What not to take away

The lessons actively work against these misreadings:

  • More autonomy is always better.
  • If it runs on a schedule, it is an agent.
  • Anything repetitive should be automated, including hard conversations.
  • Automation needs code.
  • An automation without an approval step is complete if it works.
  • Guardrails are one of an agent’s parts.
  • A well-built agent doesn’t need a human checkpoint.
  • A ChatGPT subscription pays for API calls.
  • Mapping the whole bundle is safer because nothing is missed.

Study-guide synthesis; each item is addressed in the lessons.