Agentic AI · Module 4 · Reading

Further reading

The course's own curated list for workflows and AI task execution, reproduced with what each source is for and which part of it to read. Every link is the module's recommendation, not this library's.

Before you click

The list carries its own caveat about links: web pages move and get renamed over time, so if a link doesn’t resolve, search the title in quotes — the resource is usually easy to find under the same name. Links open in a new tab. They were taken from the supplied reading list and have not been assessed here.

Core readings

Read these after the lecture. The list calls them the minimum supporting readings, written for a general, non-technical audience, and estimates 60 to 80 minutes in total if you read only the sections noted. Its own framing: the goal is to see the shape of a workflow, input, process, decision and output, and to know the five patterns that shape gets built from, not to read every source end to end.

  1. Anthropic — Building Effective AI Agents (opens in a new tab)

    The list’s primary source for the module’s five workflow patterns: prompt chaining, routing, parallelization, orchestrator-workers and evaluator-optimizer, explained with real examples.

    Read this part Read the definitions and the notes on when to use each of the five patterns; skip the code samples.

  2. Lucidchart — Flowchart Symbols and Notation (opens in a new tab)

    The visual vocabulary behind the workflow diagram: what a rectangle, a diamond and an arrow each mean, and why consistent symbols make a diagram readable by someone else.

    Read this part Read the sections on the process, decision and terminator symbols. The list says this is exactly the input, process, decision and output shape.

  3. Mastra — AI Workflows: What They Are and How to Build Them (opens in a new tab)

    Why a well-scoped step, a typed input and output, and an explicit error path turn a judgment-heavy task into something repeatable. The list calls it the reasoning behind every column of the documentation table.

    Read this part Read the sections on scoping a step narrowly and building explicit error paths, with fallbacks, escalation and retries; skip the TypeScript samples if you are not writing code.

  4. Google Cloud — Vibe Coding Explained: Tools and Guides (opens in a new tab)

    A practical framing of vibe coding as a workflow: describe the goal, let AI generate a first version, then refine it. The list maps it directly onto “Say it, don’t code it”.

    Read this part Read the explanation of the ideation, generation and refinement cycle; skip the tool-specific deployment sections.

  5. Addy Osmani — Loop Engineering (opens in a new tab)

    Five building blocks of a loop, automations, worktrees, skills, connectors and sub-agents, and why separating the agent that drafts from the agent that checks is what lets a loop run unattended.

    Read this part Read “The five pieces, and then notes” and “What the loop still does not do for you”; skip the tool-comparison table unless you are choosing between coding agents.

Practical references

These are not sit-and-read pieces. They are the how-tos for building and running your workflow in Codex, and for keeping the documentation table consistent.

  1. OpenAI — Codex Quickstart (opens in a new tab)

    How to open Codex, point it at a folder or repository, and describe the workflow you want built: the moment you hand your workflow diagram to the system that will run it.

    Read this part Read the steps for starting a task and describing your goal, and use it to set Codex up before you ask it to build anything.

  2. OpenAI — Codex cloud (opens in a new tab)

    The run-it half of building with Codex: starting a task in an isolated environment, watching it work, and reviewing the summary and diff before anything ships.

    Read this part Read the steps for connecting an environment and starting a task. The list says to treat reviewing the summary and diff as your audit gate before you trust any output.

  3. OpenAI — Codex Automations (opens in a new tab)

    The heartbeat of your loop, built in Codex itself: a prompt plus a schedule, with results landing in a review queue instead of you going back to check.

    Read this part Read how to turn a task you have already run once into a recurring automation, and use it for the every-Monday-at-8am run from the notes’ worked example.

  4. OpenAI — Build skills for Codex (opens in a new tab)

    How to write your workflow’s standards, the rubric, the categories and the audit rule, once in a SKILL.md file, so Codex applies them the same way on every run.

    Read this part Read how a skill is structured and when Codex decides to use one, then turn your documentation table’s rules into something Codex follows.

Optional deeper dives

Useful, and deliberately not required for the quiz or the deliverables. Use them only after the core readings.

  1. Mastra — Agentic Workflows: How They Work, Key Components, and How to Build Them (opens in a new tab)

    A deeper, more technical look at how routing, parallelization and looping are implemented inside a workflow engine, and why tracing and evaluations matter once a workflow runs unattended.

    Read this part Read the sections on branching, looping and observability; treat the code samples as illustrative, not a specification.

  2. Mastra — AI Workflow Automation: A Practical Guide for Developers (opens in a new tab)

    The wider landscape a Codex-built workflow sits in, from no-code tools to code-first frameworks, plus the guardrails and human-in-the-loop checkpoints that production automation needs.

    Read this part Read the comparison of no-code and code-first tools and the section on guardrails; skip the framework-specific setup.

  3. Mastra — 7 Best AI Workflow Automation Tools in 2026 (opens in a new tab)

    A tool-by-tool comparison of the automation platforms you will hear about outside the course, and where a code-first approach like Codex fits among them.

    Read this part Skim the comparison table and the tradeoffs section; you do not need every tool’s write-up.

  4. Self-Refine: Iterative Refinement with Self-Feedback (opens in a new tab)

    The research behind the evaluator and optimizer pattern: a model drafts, a separate pass critiques the draft against a standard, and the draft is revised, repeatedly, until it is good enough.

    Read this part Read the abstract and the three-step loop of generate, feedback and refine; skip the benchmark tables.

Where each one helps

Readings, mapped to the module.

How the readings map to the module · Module 4 readings p. 4
Module stopBest supporting reading
Workflow decomposition — the four momentsCore 2 (flowchart symbols); Core 1 (how the moments become named patterns)
Workflow diagram and documentation tableCore 2 (flowchart symbols); Core 3 (scoping steps and error paths)
Workflow design patternsCore 1 (Building Effective AI Agents); Optional 1 (agentic workflow mechanics); Optional 4 (Self-Refine)
Vibe coding and loop engineeringCore 4 (vibe coding explained); Core 5 (loop engineering); Optional 4 (Self-Refine)
Putting it together — build and run the workflow in CodexPractical 1-2 (Codex Quickstart and Codex cloud); Practical 3-4 (automations and skills); Optional 2-3 (the automation landscape and tools)
The readings’ stops, and the lessons on this site
StopLesson
Workflow decomposition1 · See the four moments
Diagram and documentation table2 · Draw the blueprint
Workflow design patterns3 · Choose the shape
Vibe coding and loop engineering4 · Say it, don’t code it
Putting it together5 · Assemble the workflow, and the hands-on

Read with careThe stops match the lecture notes’ five parts one to one, so each reading lands on a single lesson.

Back to the lessons