Agentic AI · Module 2 · Reading

Further reading

The course's own curated list for the compliance auditor, reproduced with what each source is for and which part of it to read. Every link is the module's recommendation, not this library's.

Before you click

The list carries its own caveat about links: web pages move and get renamed over time, so if a link doesn’t resolve, search the title in quotes — the resource is usually easy to find under the same name. Links open in a new tab. They were taken from the supplied reading list and have not been assessed here.

Core readings

Read these after the lecture. The list calls them the minimum supporting readings, written for a general, non-technical audience, and estimates 60 to 80 minutes in total if you read only the sections noted. Its own framing: the goal is to understand the ideas behind the auditor, not to read every source end to end.

  1. IBM — What are AI hallucinations? (opens in a new tab)

    Companion: AWS — What are AI hallucinations? (alternative primer) (opens in a new tab)

    A plain-language primer on why a model states false things with full confidence. It frames the failure modes the auditor is built to catch.

    Read this part Read the opening sections on what a hallucination is and why it happens; skim the mitigation list, which previews the guardrails in Core 6.

  2. OpenAI — Why language models hallucinate (opens in a new tab)

    Why confident wrong answers happen, in accessible terms: the model is rewarded for guessing rather than for admitting uncertainty. The root cause behind the four failure patterns.

    Read this part Read the main post. The takeaway the list draws out is that confidence is not evidence, which is exactly why you need an external check.

  3. Hugging Face — Using an LLM as a judge (opens in a new tab)

    The clearest hands-on explainer of the central Module 2 idea: AI can grade AI. It shows how to score output against an explicit rubric instead of a vague “is this good?”.

    Read this part Read the sections on writing a clear evaluation prompt and using a rubric with defined criteria; the list says this maps directly onto the eight checks.

  4. Anthropic — Building effective agents (opens in a new tab)

    The source for two Module 2 structures: the evaluator–optimizer loop (draft, audit, revise) and orchestrator–workers, which is the panel of specialist reviewers.

    Read this part Read the sections on the evaluator–optimizer and orchestrator–workers patterns; skip the code specifics.

  5. Anthropic — Define your success criteria (opens in a new tab)

    The reference for turning a vague sense of “good” into specific, measurable checks. This is the thinking behind writing your own rubric.

    Read this part Read for how to make criteria concrete and testable: each criterion becomes a PASS or FAIL check in your auditor.

  6. Anthropic — Reduce hallucinations (opens in a new tab)

    Practical techniques that double as audit rules: require evidence and quotes, allow the model to say “I don’t know”, and verify claims against the source.

    Read this part Read the techniques on grounding answers in provided sources and asking for citations. They become checks in your rubric and rules in the drafter’s brief.

Practical references

These are not sit-and-read pieces. They are the Claude tools the list expects you to use while you build and save the Compliance Auditor.

  1. Claude — Projects (opens in a new tab)

    A workspace that holds the auditor, its rubric, the draft and the source data, so every review starts grounded in the same place.

    Read this part Create a project for reviews, add the rubric and any reference files as project knowledge, then start each audit in a fresh chat inside the project.

  2. Claude — Prompt engineering overview (opens in a new tab)

    A short, practical guide to writing clear instructions. Use it to phrase the eight checks and the verdict-evidence-fix format so they are followed every time.

    Read this part Read the tactics on being specific and giving examples, then apply them to each line of your rubric.

  3. Claude — Use system prompts (opens in a new tab)

    Companion: Open Claude (opens in a new tab)

    How to give a model a persistent role and rules — the list's own phrasing is a strict reviewer that never rewrites silently and never passes to be agreeable.

    Read this part Turn your auditor spec into the project’s instructions, keep the guardrails, then drop in a draft to audit.

Optional deeper dives

Useful, and deliberately not required for the quiz or the deliverables. Use them only after the core readings.

  1. Anthropic — Constitutional AI: harmlessness from AI feedback (opens in a new tab)

    The deeper research behind “AI can critique AI”: a model improves output by checking it against a written set of principles — the list calls it a rubric at scale.

    Read this part Read the overview and the idea of AI feedback against explicit principles; the technical training details are optional.

  2. Madaan et al. — Self-Refine: iterative refinement with self-feedback (opens in a new tab)

    A research paper on the exact loop from the fourth stop: generate, critique, revise, repeat — and why iterating with feedback improves results.

    Read this part Read the abstract, the method figure and the results discussion; the rest is optional.

  3. Zheng et al. — Judging LLM-as-a-Judge (MT-Bench) (opens in a new tab)

    A rigorous look at how good AI judges actually are, and the biases they show — length, position and self-preference. The list calls it a healthy reminder that the judge is not an authority.

    Read this part Read the sections on judge agreement with humans and on known biases; skip the benchmark mechanics.

  4. NIST — AI Risk Management Framework (opens in a new tab)

    A widely used framework for thinking about AI risk, including the kinds of harm the Risk and Privacy checks guard against. Background for the trust-layer framing.

    Read this part Browse the core functions — Govern, Map, Measure, Manage — for the vocabulary. You do not need to read the full framework.

Where each one helps

Readings, mapped to the module.

How the readings map to the module · Module 2 readings p. 6
Module stopBest supporting reading
Stop 1 — How AI failsCore 1 and Core 2 (what hallucinations are and why they happen); Optional 3 (how AI judges can be biased)
Stop 2 — AI as a judgeCore 3 (using an LLM as a judge); Optional 1 (AI giving feedback against written principles)
Stop 3 — Build the auditor (the rubric)Core 5 (define success criteria); Practical 1, 2 and 3 (keep the auditor, rubric and data together; write its instructions; set its role)
Stop 4 — Run the loopCore 4 (the evaluator–optimizer loop); Optional 2 (Self-Refine)
Stop 5 — A panel of reviewersCore 4 (orchestrator–workers: several specialised checkers); Core 3 (a rubric per specialist)

Read with careThe readings speak of five stops where the lecture notes use seven numbered sections. Stop 1 covers sections 1 and 2, then stops 2 to 5 follow sections 3 to 6 in order.

The readings' five stops, and the lessons on this site
StopLesson
Stop 1 — How AI fails1 · Why a trust layer, and 2 · Four failure patterns
Stop 2 — AI as a judge3 · AI as a reviewer
Stop 3 — Build the auditor4 · The eight checks
Stop 4 — Run the loop5 · Run the loop
Stop 5 — A panel of reviewers6 · Specialist judges

Read with careBoth vocabularies are kept: the stops are the reading list's, the numbered sections are the lecture notes'.

Back to the lessons