Agentic AI in Practice · Module 02

Module 2 · The AI Compliance Auditor

The trust layer: a separate reviewer that checks the work before a human approves it.

Six short lessons on checking AI output rather than trusting it. The four ways a draft goes wrong, how to put an assistant in the reviewer's chair, the eight-check rubric, the draft-audit-fix-re-audit loop, and a three-judge sequence for the work that carries risk.

  • Hallucinations
  • AI as a judge
  • Rubrics
  • Audit loops
  • Risk and privacy

Module introduction

A polished answer and a correct answer can look the same.

Module 1 taught the assistant how to write the work. Module 2 adds a separate reviewer that checks the work before a human approves it — because a clear, confident answer can still be wrong, and tone tells you nothing about whether the facts hold. Everything here builds toward one reusable rubric and an audit log that ends in a verdict.

What the trust layer compares · Module 2 lecture notes p. 1
  1. The writerA draft arrivesFluent, confident, and not yet checked.
  2. The auditorTwo comparisonsAgainst the sources it should have come from, and against a clear standard.
  3. The outputWhat failed, and whyNamed failures with their evidence — not a general opinion.
  4. The humanThe decisionThe reviewer helps catch problems; a person still approves the work.

Tone and formatting are not part of either comparison. They are what made the draft look finished in the first place.

Your learning path

Six short lessons, then one rubric you reuse.

Open source guide
01Why a trust layerA clear, confident answer can still be wrong. The trust layer compares a draft with its sources and with a clear standard — and leaves the final decision with a person.9 min02Four failure patternsFabrication, false source, overgeneralization and silent omission. Two of them add something that was never there; two of them distort or drop what was.12 min03AI as a reviewerSeparate the writer from the reviewer, start every review in a fresh chat, ask for checks rather than opinions, and require a verdict, evidence and a fix for each one.11 min04The eight checksFactuality, source support, completeness, tone, audience fit, formatting, risk and privacy — each with a question to ask and a named risk it catches.13 min05Run the loopDraft, audit all eight, fix only what failed, then re-audit all eight in a fresh chat. A revised draft does not pass automatically, because a fix can create a new problem.11 min06Specialist judgesSplit the rubric across three judges — evidence and factuality, completeness and priority, then risk, privacy and executive fit — and run them in order, stopping at the first failure.10 minWhat you keep from Module 2The recap, the five artifacts, and the line to leave with.SummaryHands-on: the audit gateThe same five sources, your own Module 1 brief, and the eight checks with a verdict, evidence and a fix.Hands-onFurther readingSix core readings, three Claude references and four optional dives, mapped to the module's five stops.Reading