Agentic AI · Module 2 reference
Glossary
Short definitions as the module uses them, each linked to the lesson it comes from.
- Trust layer
A separate review step that compares a draft with its sources and with a clear standard before a human approves it.
Review Lesson 1- Compliance auditor
The module's name for the reviewer: an assistant given the rubric and asked to check a draft against it, not to improve it.
Review Lesson 1- The writer creates, the auditor checks, the human decides
The module's mental model. Three roles, and only the last one approves anything.
Review Lesson 3- Fabrication
Adding something that is not in the source. The notes' example is inventing a subscription charge.
Review Lesson 2- False source
Naming a source that was never provided or cannot be checked — “according to your bank statement” when none was given.
Review Lesson 2- Overgeneralization
Making a broad claim from weak or limited evidence, such as “always overspends” from two transactions.
Review Lesson 2- Silent omission
Leaving out important source content without a warning. It cannot be caught by reading the draft alone.
Review Lesson 2- Fresh chat
A new conversation for every review, so the reviewer starts with a clean view of the draft rather than the author's intent.
Review Lesson 3- Checks, not opinions
Asking for specific verdicts against named criteria instead of “is this good?”, which invites agreement.
Review Lesson 3- Verdict, evidence, fix
What every check must return: a pass or fail, the lines that prove it, and the smallest change that would make it pass.
Review Lesson 3- Rubric
A standard made specific enough to pass or fail. Here, eight named checks, each with a question and a risk.
Review Lesson 4- Factuality
Check 1: are claims, dates, owners and numbers true? It catches wrong facts and calculations.
Review Lesson 4- Source support
Check 2: does every important claim come from a provided source? It catches unsupported claims and false sources.
Review Lesson 4- Completeness
Check 3: is an important decision, deadline, risk or action missing? It catches silent omission.
Review Lesson 4- Tone
Check 4: is the language direct, calm and suitable for the job? It catches a wrong or unclear voice.
Review Lesson 4- Audience fit
Check 5: can the named reader use it quickly? It catches a reader mismatch, and it changes with the job.
Review Lesson 4- Formatting
Check 6: does the draft follow the required structure? The structure comes from your own brief, not from these notes.
Review Lesson 4- Risk
Check 7: could a wrong line cause operational, financial, legal or reputation harm? It catches a costly or unsafe action.
Review Lesson 4- Privacy
Check 8: does the draft expose sensitive or unnecessary private information?
Review Lesson 4- The audit loop
Draft, audit all eight, fix only the failures, re-audit all eight in a fresh chat, then stop or ask a human.
Review Lesson 5- Re-audit
The second full pass after a fix. It exists because a fix can create a new problem.
Review Lesson 5- Required checks
The subset that must pass before the loop stops. The notes use the phrase without saying which of the eight are required, so you decide and record it.
Review Lesson 5- Audit log
A short record of what failed, what changed, and when it passed, ending in a verdict.
Review Lesson 5- REVIEWED — PASS
The log's verdict when every required check passes. It is evidence for an approval, not the approval.
Review Lesson 5- REVIEWED — BLOCKED
The log's verdict when a required check still fails, or when the decision needs a person.
Review Lesson 5- Specialist judge
A reviewer given part of the rubric: evidence and factuality, completeness and priority, or risk, privacy and executive fit.
Review Lesson 6- Sequence rule
Run the judges in order; if one fails, stop, fix, and rerun that same judge before moving on.
Review Lesson 6- Evaluator–optimizer
The readings' name for the draft-and-judge loop: one role produces, another evaluates, and the cycle repeats.
Review Lesson 5- Orchestrator–workers
The readings' name for the panel: a coordinator and several specialised checkers, each with a narrow task.
Review Lesson 6- Audit Gate Modes
Named in the notes as part of what you keep, alongside the Module 1 drafting instruction. The modes themselves are not defined in the supplied material.
Review Lesson 6