Agentic AI · Module 2Lesson 2

Study explanation · Lesson 02 · 12 min

Four ways a draft goes wrong

Fabrication, false source, overgeneralization and silent omission. Two of them add something that was never there; two of them distort or drop what was.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

The four patterns, with the notes' own examples

Rather than a general warning about accuracy, the notes name four specific failures and illustrate each from the same domain — a personal finance summary. Naming them matters: a reviewer that knows what it is looking for finds more than one asked to judge quality.

Four common failure patterns · Lecture notes p. 1, §2
PatternWhat it meansFinance example
FabricationAdds something that is not in the source.Invents a Netflix Premium charge.
False sourceNames a source that was never provided or cannot be checked.Says “according to your bank statement” when none was given.
OvergeneralizationMakes a broad claim from weak or limited evidence.Says someone “always” overspends, from two transactions.
Silent omissionLeaves out important source content without a warning.Drops three real transactions from the summary.

Read with careThe examples are the notes' own. The bank statement, the subscription and the transactions are illustrations, not advice.

Two patterns add something

Fabrication and false source both put something into the draft that the evidence never contained. Fabrication invents the content itself. False source invents the authority for it, which is the more dangerous of the two, because a named source reads as a citation and invites the reader to stop checking.

  • Fabrication A charge, a name, a date or a number that no source contains. It is an addition, so it can be found by looking for claims with nothing behind them.
  • False source “According to the bank statement…” when no statement was ever provided. The claim may even be true; the attribution is invented, and that is enough to fail the check.
Four failures, two kinds · Module 2 lecture notes p. 1

Adds what was never there

  • Fabrication: content no source contains.
  • False source: an invented authority for a claim.
  • Both can be found by asking what is behind each line.

Distorts what was

  • Overgeneralization: thin evidence stretched into a confident claim.
  • Silent omission: real content dropped without a warning.
  • Only a comparison with the source finds the second one.

The notes illustrate all four from one finance summary: an invented charge, a bank statement nobody sent, “always overspends” from two transactions, and three real transactions missing.

Two patterns distort what was there

Overgeneralization and silent omission both stay inside the source material and still mislead. Overgeneralization stretches thin evidence into a confident claim — two transactions become “always”. Silent omission is the quietest failure of the four: nothing in the draft looks wrong, because the problem is what is not on the page.

Key ideaSilent omission is the failure a reader cannot catch by reading. Only a comparison with the source finds it, which is why the audit works from the sources rather than from the draft alone.

The same four patterns in Lina's week

The hands-on pack gives the four patterns something concrete to bite on, because it is full of things that are expected rather than confirmed. A draft that turns any of them into a fact has failed one of these checks.

  • Fabrication: a revised launch timeline that nobody has sent yet.
  • False source: “facilities confirmed the lease renewal date” — facilities confirmed nothing.
  • Overgeneralization: “engineering is slipping” from one blocked integration.
  • Silent omission: the Thursday headcount deadline missing from a brief, with no note that it was dropped.

Applied to the hands-on packEach of these is a reading of the supplied sources rather than a line from the notes: the notes give the patterns, the hands-on gives the week, and the pairing is this site's.

Key takeaways

  • Fabrication adds content; false source adds authority for content.
  • Overgeneralization stretches thin evidence into a confident claim.
  • Silent omission cannot be caught by reading the draft alone.
  • Named patterns make a reviewer more useful than a request to judge quality.

Study explanation based on the supplied Module 2 lecture notes for Agentic AI in Practice. The notes accompany slides that were not supplied. Open the source notes above for page-level traceability.

Your study checkpoint

Ready to continue?

Mark the lesson complete once you have read it and tried its idea on something real.

Next · Lesson 3