Agentic AI · Module 2Module summary

Module summary · 6 min

What you keep from Module 2

One rubric, one loop, one sequence and a log that ends in a verdict. The reviewer produces evidence; the decision stays with a person.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

Six lessons, six lines

The fastest way back into the module before an audit or a discussion.

Module 2 in one line per lesson · Lecture notes pp. 1-3
LessonIn one line
1 · Why a trust layerA confident answer can still be wrong, so compare the draft with its sources and a standard.
2 · Four failure patternsFabrication, false source, overgeneralization, silent omission.
3 · AI as a reviewerSeparate roles, fresh chat, checks not opinions, and a verdict with evidence and a fix.
4 · The eight checksFactuality, source support, completeness, tone, audience fit, formatting, risk, privacy.
5 · Run the loopDraft, audit, fix only the failures, re-audit all eight in a fresh chat.
6 · Specialist judgesThree narrow reviewers in order; a failure stops the sequence.

The five things you take away

The notes close on artifacts rather than ideas. Four of the five are yours to write down once and reuse; the fifth is produced fresh by every audit.

  • One Claude Project with the exact Module 1 drafting instruction plus the Module 2 Audit Gate Modes.
  • One reusable eight-check compliance rubric.
  • A manual draft → audit → fix → re-audit loop.
  • A three-judge review sequence.
  • A final audit log marked REVIEWED — PASS or REVIEWED — BLOCKED.

Read with careThe Audit Gate Modes are named in this list and defined nowhere in the supplied material. Treat the phrase as the notes' own label for the auditor's instructions, and write your own.

The line to leave with

The notes end on the observation the whole module is built to answer, and the answer is not a better model. It is a check with rules you wrote down and evidence anyone can follow.

Key ideaA polished answer and a correct answer can look the same. Trust comes from a check with clear rules and evidence.

Where to go next

Two pages carry the module forward: the hands-on runs the gate on a brief you produced yourself, and the reading list follows each stop into the sources the course recommends.

  • Hands-on: the audit gate The five sources from Module 1, your own brief, and the eight checks with a verdict, evidence and a fix for each.
  • Further reading Six core readings, three Claude references and four optional dives, mapped to the five stops.

Recap of the supplied Module 2 lecture notes, pages 1 to 3.

Your study checkpoint

Run the gate on your own brief

The hands-on gives you the five sources, the eight checks and a log that ends in a verdict. The practice page checks what stuck.