Agentic AI · Module 2Lesson 5

Study explanation · Lesson 05 · 11 min

Run the loop until it passes

Draft, audit all eight, fix only what failed, then re-audit all eight in a fresh chat. A revised draft does not pass automatically, because a fix can create a new problem.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

Six moves, in order

The loop is the operating procedure for the rubric. It is short enough to remember and strict about two things: what you change between rounds, and what gets re-checked afterwards.

  1. Draft the brief.
  2. Audit all eight checks.
  3. Fix only the failed items.
  4. Re-audit all eight checks in a fresh chat.
  5. Stop when all required checks pass, or ask a human when judgment is needed.
  6. Keep a short audit log: what failed, what changed, and when it passed.
Draft, audit, fix, re-audit · Module 2 lecture notes p. 2
  1. Round 1Draft the briefFrom the Module 1 specification.
  2. Round 1Audit all eight checksA verdict, evidence and a fix for each.
  3. Between roundsFix only the failed itemsNothing else, so the next round stays attributable.
  4. Round 2Re-audit all eight, fresh chatNot just the two that failed.
  5. Two exitsPass, or ask a humanThen log what failed, what changed, and when it passed.

A revised draft does not pass automatically: a fix can create a new problem, so the full audit runs again.

Fix only what failed

The instruction is narrow on purpose. A round that also improves the wording, tightens a paragraph and reorders a section makes the next audit impossible to read: when something fails, you cannot tell which change caused it. Repairing only the failed items keeps each round attributable.

A revised draft does not pass automatically

This is the line the notes emphasise, and the one most often skipped in practice: a fix can create a new problem, so the full audit runs again. Correcting a date can break a sentence's tone. Removing a private remark can remove the only mention of a real risk. The second audit is not a formality — it is where fixes are checked.

Key ideaRe-audit all eight, in a fresh chat. Not the two that failed, and not in the conversation that just fixed them.

Stop, or ask

The loop has two exits, and only one of them is “it passed”. The other is asking a human, for the cases where the question is judgment rather than fact. A reviewer can establish that a claim has no source; it cannot decide whether a risk is worth taking. Knowing which exit you are at is part of running the loop.

Read with careThe notes say to stop when all required checks pass, without stating which of the eight are required. That choice is left to whoever runs the audit, so make it explicitly and write it down rather than deciding it check by check.

The audit log

Three things go in the log: what failed, what changed, and when it passed. It is the smallest record that makes an approval defensible afterwards, and it is the reason the loop is worth running twice rather than once. The final entry carries the verdict — reviewed and passed, or reviewed and blocked.

  • Which checks failed, in which round.
  • What was changed in response, and only that.
  • When every required check passed — or which one still blocks it.
  • The final verdict: REVIEWED — PASS, or REVIEWED — BLOCKED.

The same loop, in the research

Two of the module's readings describe this loop from the outside. One names the pattern — an evaluator and an optimizer, one drafting and one judging. The other is a paper on generating, critiquing, revising and repeating, and on why iterating with feedback improves the result. The loop in the notes is the practical form of both.

Key takeaways

  • Draft, audit all eight, fix only the failures, re-audit all eight in a fresh chat.
  • A fix can create a new problem, so a revised draft never passes automatically.
  • Fixing only what failed keeps each round attributable.
  • The loop has two exits: everything required passes, or a human is asked.
  • The log records what failed, what changed, when it passed, and the final verdict.

Study explanation based on the supplied Module 2 lecture notes for Agentic AI in Practice. The notes accompany slides that were not supplied. Open the source notes above for page-level traceability.

Your study checkpoint

Ready to continue?

Mark the lesson complete once you have read it and tried its idea on something real.

Next · Lesson 6