Eight questions, eight risks
The rubric is the module's central artifact. Each check is a question a reviewer can answer about a draft, paired with the failure it exists to catch. Read the right-hand column and the four patterns from the last lesson reappear inside it.
| Check | Question | Main risk caught |
|---|---|---|
| 1 · Factuality | Are claims, dates, owners and numbers true? | Wrong facts or calculations |
| 2 · Source support | Does every important claim come from a provided source? | Unsupported claims or false sources |
| 3 · Completeness | Is an important decision, deadline, risk or action missing? | Silent omission |
| 4 · Tone | Is the language direct, calm and suitable for the job? | Wrong or unclear voice |
| 5 · Audience fit | Can Lina and her chief of staff use it quickly? | Reader mismatch |
| 6 · Formatting | Does it follow the required three-section structure? | Wrong output shape |
| 7 · Risk | Could a wrong line cause operational, financial, legal or reputation harm? | Costly or unsafe action |
| 8 · Privacy | Does it expose sensitive or unnecessary private information? | Privacy leak |
Key ideaThe rubric is the last lesson turned into questions. Read the right-hand column and the four failure patterns are all there — which is why a reviewer given these eight finds more than one asked whether a draft is good.
Three kinds of question
The eight are listed flat, and they are not all the same kind of question. Checks 1 to 3 ask whether the content is true, supported and whole. Checks 4 to 6 ask whether it fits its reader and its required shape. Checks 7 and 8 ask what it could cost. Grouping them this way is a reading aid rather than part of the rubric, and it is useful mainly because the groups fail differently: the first three are settled by comparison with the sources, the second three by comparison with your brief, and the last two by judgment.
- Is it true and whole?
- 1 · Factuality
- 2 · Source support
- 3 · Completeness
- Does it fit its job?
- 4 · Tone
- 5 · Audience fit
- 6 · Formatting
- What could it cost?
- 7 · Risk
- 8 · Privacy
The notes list the eight flat and in this order. The grouping is a reading aid from this site, because the three groups fail — and are evidenced — differently.
This grouping is the site'sThe notes present the eight checks as a single numbered list with no grouping. Nothing here changes their wording, their order or their number.
Two checks need your brief, not the notes
Check 5 names Lina and her chief of staff, and check 6 names a required three-section structure. Both come from the Module 1 drafting brief the auditor is checking against, not from these notes — the notes never set out what the three sections are. When you reuse the rubric for your own work, those two lines are the ones you rewrite: your reader, and your required shape.
Read with careThe three-section structure is referred to but never defined in the supplied Module 2 material. If your Module 1 brief did not specify a structure, check 6 has nothing to test against until you give it one.
What counts as evidence for each check
A rubric only works if a failing verdict can be shown rather than asserted. For the first three checks the evidence is a source; for the middle three it is the brief; for the last two it is a stated consequence. That distinction is worth settling before the first audit, because it decides what the reviewer is allowed to say.
- Factuality and source support: quote the draft line and the source line beside it.
- Completeness: name the item that is missing and the source it appears in.
- Tone, audience fit and formatting: quote the requirement in the brief that the draft misses.
- Risk: state the specific harm a wrong line could cause, not that risk exists.
- Privacy: name the sensitive detail and say why the reader does not need it.
A working rule, not the notes'The notes require a verdict, evidence and a fix for every check but do not say what evidence each check takes. The list above is this site's working rule, consistent with the readings' advice to require quotes and to ground answers in provided sources.
Turning “good” into eight testable lines
The core reading behind the rubric is about exactly this move: taking a vague sense of good and making it specific and measurable. The list's own phrasing is that each criterion becomes a PASS or FAIL check in your auditor. The eight checks are that advice already carried out once, on one job — which is why they can be reused rather than reinvented.
Key takeaways
- Eight checks, each with a question and the risk it catches.
- The first three are settled against the sources, the next three against your brief, the last two by judgment.
- Audience fit and formatting carry details from the Module 1 brief, so they change when the job changes.
- The three-section structure is named in the notes but never defined there.
- A rubric is a vague standard made specific enough to pass or fail.