A confident answer is not a checked answer
Module 2 opens on an uncomfortable observation: a clear, confident answer can still be wrong. Tone and formatting do not prove that facts are correct or complete. An assistant that writes well writes wrong facts just as smoothly as right ones, and the fluency is what makes the mistake hard to see.
Key ideaA polished answer and a correct answer can look the same. That is the whole reason this module exists.
What the trust layer does
The notes define the trust layer by what it compares. It puts the draft next to two things: the sources it was supposed to come from, and a clear standard for what a good answer contains. Anything that cannot be traced to a source, or that fails the standard, is flagged rather than quietly accepted.
- It compares the draft with its sources, claim by claim.
- It compares the draft with a clear standard, not with a general sense of quality.
- It reports what fails, so the failure can be fixed rather than argued about.
- The writerA draft arrivesFluent, confident, and not yet checked.
- The auditorTwo comparisonsAgainst the sources it should have come from, and against a clear standard.
- The outputWhat failed, and whyNamed failures with their evidence — not a general opinion.
- The humanThe decisionThe reviewer helps catch problems; a person still approves the work.
Tone and formatting are not part of either comparison. They are what made the draft look finished in the first place.
The reviewer helps; the human decides
The notes are careful about how much authority the reviewer has: it helps catch problems, and a human still makes the final decision. That sentence is the boundary the whole module works inside. The audit produces evidence for a decision; it does not make the decision, and a passing audit is not an approval.
Read with careThese notes accompany slides that were not supplied with them. Everything on this site comes from the notes, the additional readings and the hands-on input, and page citations are to those PDFs.
Where Module 1 stops
The module states its own relationship to the last one in a single line: Module 1 taught the assistant how to write the work, and Module 2 adds a separate reviewer that checks the work before a human approves it. If you built a saved specification and a Definition of Done in Module 1, this module is what happens to the draft that specification produces.
How the two modules meetModule 1 ended with a Definition of Done: goal met, right audience and format, facts verified by a human, nothing private leaked, nothing important missing. Module 2 turns that spirit into eight named checks that a reviewer runs, one at a time, with evidence.
Key takeaways
- Fluency is not evidence: a confident draft can be wrong.
- The trust layer compares the draft with its sources and with a clear standard.
- The reviewer catches problems; a human still owns the decision.
- Module 2 is the check on what Module 1 taught the assistant to write.