Agentic AI · Module 2 · Hands-on

The audit gate

The Module 2 hands-on has no report in it. The evidence pack is the same five sources you worked from in Module 1, and the draft under audit is the Weekly Executive Brief your own assistant produced. Paste it, run the eight checks, and end with an audit log that says PASS or BLOCKED.

How to use this page

No dummy report is included, and that is deliberate: the point of Module 2 is to audit the real output from Module 1. Paste the actual Weekly Executive Brief your assistant produced — the placeholder in the supplied document is where it goes during the demo.

The five sources below are the Module 1 pack, repeated unchanged in the Module 2 input. Nothing new has been added to the week, because the exercise is about checking a draft rather than gathering more material.

The auditor should not use outside knowledge. Every judgment has to come from the five sources and the brief you produced in Module 1 — which is also what makes a failing verdict provable.

The standard

Eight checks, each with the risk it catches.

The eight checks you are about to run · Module 2 lecture notes p. 2
CheckQuestionMain risk caught
1 · FactualityAre claims, dates, owners and numbers true?Wrong facts or calculations
2 · Source supportDoes every important claim come from a provided source?Unsupported claims or false sources
3 · CompletenessIs an important decision, deadline, risk or action missing?Silent omission
4 · ToneIs the language direct, calm and suitable for the job?Wrong or unclear voice
5 · Audience fitCan the reader you named use it quickly?Reader mismatch
6 · FormattingDoes it follow the structure your brief required?Wrong output shape
7 · RiskCould a wrong line cause operational, financial, legal or reputation harm?Costly or unsafe action
8 · PrivacyDoes it expose sensitive or unnecessary private information?Privacy leak

Source 1 · Handwritten notebook

Transcribed from the page

Messy, abbreviated, half-sentences — as scrawled in a notebook and transcribed.

A photograph of a spiral notebook page, handwritten in blue ink, with entries under the headings MON, TUE, WED and THUR.
Source 1 as it arrived: a page of the week, handwritten. The transcription below is the one supplied with the exercise · Hands-on pp. 1-2

Mon

  • standup. eng behind on payments API. Omar says ~1 wk slip “maybe”, not sure
  • design team fine, ahead actually
  • budget?? finance wants numbers by THURS — ASK PRIYA, don’t forget
  • note to self: cancel tues vendor call, total waste of time

Tue

  • coffee w/ Sara — Henderson contract “almost there”, legal reviewing
  • she thinks sign by end of week?? not confirmed
  • office lease — someone mentioned renewal coming up. when?? check w/ facilities

Wed

  • new ops coordinator starts MONDAY. need onboarding plan, nothing ready yet
  • Dana pushing launch back. again.
  • board meeting — 14th? need to prep the ops slide

Thur

  • forgot to send Priya the numbers ARGH. do first thing
  • ask: are we still hiring 2 coordinators or 1? P thinks 2

Source 2 · Typed standup notes

Shared in the team channel

Cleaner, typed up by the chief of staff.

Monday

  • Engineering: Payments API blocked on third-party sandbox. Omar estimates a possible 1-week slip, not certain until vendor responds.
  • Design: On track, slightly ahead.

Wednesday

  • Payments API still blocked. Omar escalating to vendor support.
  • Marketing: Launch moved to next month. Dana confirmed — dev wasn’t ready.
  • Ops: New ops coordinator starts Monday. No onboarding plan yet.

Friday

  • Henderson contract: Legal still reviewing. Sara expects sign-off by end of week but flagged as not final.
  • Finance: Priya needs Q3 headcount numbers — deadline Thursday.

Open questions

  • Hiring 1 or 2 ops coordinators? (Finance assumed 2.)
  • Office lease renewal — timing unknown, needs facilities to confirm.

Source 3 · Q3 priorities and status

Exported from a project page

Structured, with owners and priority levels.

  • P1 · Ship payments integration — at risk, blocked on sandbox. Owner: Omar. Possible 1-week slip, unconfirmed.
  • P1 · Close Henderson contract — in legal review. Owner: Sara. Expected sign-off end of week (not final).
  • P1 · Q3 board deck — not started. Board meeting June 14. Lina owns the ops slide. Needs headcount numbers from Finance.
  • P2 · Hire ops coordinators — 1 starts Monday. Hiring 1 or 2 total? Finance assumes 2.
  • P3 · Marketing launch — pushed to next month (Dana). New timeline pending.
  • Facilities · Office lease renewal flagged, no date. Needs confirmation.

Source 4 · Four forwarded emails

Forwarded threads in the inbox

Each adds something the other sources do not carry.

Priya Nasser (Finance) · URGENT — Q3 headcount numbers

  • Need confirmed Q3 headcount numbers by Thursday COB or we miss the board deck. Are the 2 new ops coordinator roles still planned and budgeted? Finance forecasting for 2.

Dana Khoury (Marketing) · Launch timeline

  • Pushing launch to next month, dev wasn’t ready. Will resend revised timeline early next week.

Sara Mansour (Legal) · Henderson contract

  • Henderson still with legal. Hopeful for sign-off end of week but can’t promise — one indemnity clause in dispute.

Investor Relations · Board meeting June 14 — Ops slide

  • Board meeting June 14. Ops section of deck ready for review by June 12.

Source 5 · Voice memo

Auto-transcribed, unedited

Recorded in the car on Thursday evening — run-on and lowercase, as transcribed.

  • “follow up with sara on the henderson contract... board meeting is the fourteenth i think, need to prep the ops slide, that’s the main thing for next week... somebody mentioned office lease renewal, check that... still haven’t sent priya the headcount numbers, do that first thing, that’s the urgent one... new coordinator starts monday and we have nothing ready for onboarding, throw something together this weekend... cancel that vendor call.”

What the sources actually say

Nine threads, two of them unresolved.

The same week, read across all five sources · Hands-on pp. 1-4
ThreadWhat the sources sayState
Payments APIA possible one-week slip, blocked on a third-party sandbox, owner Omar. Every source marks it unconfirmed.Consistent, and openly uncertain
Henderson contractStill with legal; sign-off expected by end of week but not final. Only the email says why: one indemnity clause in dispute.The email carries the reason
Q3 headcountFinance needs the numbers by Thursday close of business or the board deck slips. The notebook and the memo both record that they still have not been sent.Overdue, and the most urgent item
One coordinator or twoFinance assumes and is forecasting for two. The standup lists it as an open question. Nobody confirms it.Unresolved: an assumption, not a decision
Board meetingThe notebook guesses the 14th; the export says June 14; the email confirms it and adds that the ops section is due for review by June 12.The email resolves it and adds a deadline
New coordinatorStarts Monday. No onboarding plan exists.Consistent across sources
Marketing launchPushed to next month because development was not ready. A revised timeline is promised early next week.Timeline still pending
Office leaseA renewal was mentioned. No date. Facilities has to confirm.A gap, not a fact
Vendor callOnly in the private notes and the memo: cancel it, “total waste of time”.A private judgment

Read with careReading across the sources is the work. Two of these rows are unresolved, and one is a private remark that should never reach a shared update.

Now run the gate

Verdict, evidence, fix.

Paste the brief your own assistant produced, then work the eight checks one at a time. A failing verdict is only useful if you can show it, so every check asks for the evidence beside it — and a failure asks for the smallest fix that would make it pass. The supplied input refers to prompts P1 and P3 asking for the brief to review or audit. Those prompt texts are not in the material, so they are named here and not reconstructed.

  1. 1 · The brief to audit
  2. 2 · The eight checks
  3. 3 · Your audit log

Paste the brief to audit

Not a sample — the Weekly Executive Brief your own assistant produced in Module 1. The supplied input ships no draft on purpose: a pre-written report has nothing at stake, and the four failure patterns only show up in a real one.

Nothing is saved or sent. Leaving or refreshing the page clears it.

Paste at least a few sentences of your own brief to continue.

Hands-on input: “Lina’s Module 2 audit inputs · Source pack + actual Module 1 output placeholder · Week of June 1”, pages 1 to 6. The five sources are the Module 1 pack, repeated unchanged in the Module 2 input; the eight checks and the verdict-evidence-fix format are the lecture notes'. Review the rubric or go back to Lina's week.