The knowledge layer: name the source, then let the AI act.
Six short lessons on letting an assistant act across real files without letting it guess. Connect one chat to the whole workspace, read before acting, keep every send behind a confirmation, name each source before using it, turn messy records into a clean ledger without inventing values, and let the spreadsheet do the math.
Module 1 taught the assistant how to write the work, and Module 2 added a reviewer to check it. Module 3 lets the assistant act: read a folder, draft a reply, book a meeting, add a task, and build a ledger from bank exports and receipts. The library’s rule for all of it fits on one line: every action traces back to a file, every number traces back to a source, and a human confirms before anything is sent, booked or filed.
The hands-on chain, in order · Module 3 prompt library pp. 1-2
UnderstandRead the folderEvery file, its type, and what it needs. No action yet.
Act, with confirmationReply, book, task, remindEach one drafted from a named source and held for a person to confirm.
Name the sourcesSource RegistryAn ID, reliability and privacy label for every file; unknown stays unknown.
Extract, transform, loadClean LedgerOne row per transaction, raw beside cleaned, unreadable values flagged.
CalculateSummary by formulaTotals the sheet computes, with flagged rows shown separately.
Each step keeps its output, because the next step builds on it.