From writing to acting
The first two modules kept the assistant on the page: it drafted, and a reviewer checked. This module connects it to a working folder, an inbox, a calendar and a task list, so its output can become a sent email or a booked meeting. That is exactly why the rules get stricter.
Key ideaName the source, then let the AI act. Every action traces back to a file, every number traces back to a source, and a human confirms before anything is sent, booked or filed.
Read with careThe Module 3 lecture notes, slides and hands-on recording were not supplied. These lessons follow the prompt library’s own teaching points, and page citations are to the library and the reading list.
Confirm the connections first
The library’s first foundation prompt asks for no work at all. It names the folder, asks the assistant to confirm it can see it, and to confirm it is connected to the mail, calendar and task tools, then to wait. The weak version, can you help me with my email and calendar today, starts work before anyone knows whether the tools are reachable.
- It discovers a missing connection before a booking, not halfway through one.
- The mistake it avoids is assuming a connection exists because it worked last time.
The improved prompt · P0I’m going to work from a Google Drive folder called [FOLDER NAME]. Confirm you can see it with @Google Drive, and confirm you’re connected to @Gmail, @Calendar, and @Google Tasks. Once confirmed, wait for my first prompt — don’t take any action yet.
Work from a folder the assistant can actually see
Every prompt in the library assumes one shared folder, Lina’s Evidence Room, holding the raw sources: an email, a task note, a bill, a bank export and receipts. Before asking for any output, you point the assistant at the folder or the specific file, so that it never answers from memory.
- Replace every placeholder, such as a bracketed file name, before sending a prompt.
- Demand a draft, not a send, for anything that writes to mail, calendar, tasks or a sheet.
- Keep each output, because the prompts form a chain.
The chain this module builds
The hands-on prompts run in a fixed order, and each one depends on the last. The first half handles a week’s action items; the second half switches to data discipline.
- UnderstandRead the folderEvery file, its type, and what it needs. No action yet.
- Act, with confirmationReply, book, task, remindEach one drafted from a named source and held for a person to confirm.
- Name the sourcesSource RegistryAn ID, reliability and privacy label for every file; unknown stays unknown.
- Extract, transform, loadClean LedgerOne row per transaction, raw beside cleaned, unreadable values flagged.
- CalculateSummary by formulaTotals the sheet computes, with flagged rows shown separately.
Each step keeps its output, because the next step builds on it.
Key takeaways
- Acting across tools raises the stakes, so the rules get stricter, not looser.
- Confirm the folder and every connection before the first real request.
- Point the assistant at the source before asking for output; never let it answer from memory.
- The AI proposes and a person confirms, for every send, booking or filing.