Agentic AI · Module 3 reference

Glossary

Short definitions as the module uses them, each linked to the lesson it comes from.

Knowledge layer

The library’s name for the hands-on build: a sheet of named sources, a clean ledger and formula totals, all traceable to files.

Review Lesson 1
Evidence Room

The fictional Drive folder holding Lina’s raw sources: an email, a task note, a bill, a bank export and receipts.

Review Lesson 1
Key mindset

Name the source, then let the AI act; the AI proposes, and a human confirms before anything is sent, booked or filed.

Review Lesson 1
@-mention

Naming a connected tool or folder in the prompt, such as @Google Drive or @Calendar, so the assistant works from it.

Review Lesson 1
Read before you act

Asking for a table of every file and what it needs before any action, so implied requests are caught.

Review Lesson 2
Draft, don’t send

Keeping every action that writes to mail, calendar, tasks or a sheet behind a person’s confirmation.

Review Lesson 3
Confirmation step

The point where the assistant shows a draft and waits. The library calls it the teaching point.

Review Lesson 3
Data Steward

The role the assistant is given when the chain switches from action items to naming and organizing sources.

Review Lesson 4
Source ID

A short label for each file with a type prefix: TXN, REC, DOC, NOTE or EMAIL, numbered in order.

Review Lesson 4
Source Registry

The sheet tab listing each source’s ID, file name, type, reliability, privacy and what it can answer.

Review Lesson 4
Reliability rating

High, medium, low or unknown, based on what kind of document a source is. Clarity is not evidence.

Review Lesson 4
Privacy label

Personal, sensitive or shareable, recorded for each source in the registry.

Review Lesson 4
ETL

Extract, transform, load: pull the data out, fix and reshape it, then load it into one clean place.

Review Lesson 5
Clean Ledger

The tab with one standardized row per transaction, the raw description kept, and the source ID on every row.

Review Lesson 5
Needs review

A yes or no column marking smudged, unreadable or unclear values, with a reason. An honest flag beats a tidy guess.

Review Lesson 5
Confidence

High, medium or low, shown beside each category the assistant suggests.

Review Lesson 5
Tidy data

One row per record, one value per cell, consistent names and no merged cells, as the core readings put it.

Review Lesson 5
Data quality

Accuracy, completeness and consistency; failures of these become needs-review flags.

Review Lesson 5
SUMIF

A spreadsheet formula that totals the rows matching a condition, such as a category. Clicking it shows its working.

Review Lesson 6
Unconfirmed — needs review

The separate line in the summary for flagged amounts, kept out of confirmed totals.

Review Lesson 6
Guardrail

One of four optional standing rules for when the workflow slips: no auto-send, don’t guess a number, don’t blend unlabeled sources, stop and ask.

Review Lesson 6
Data lineage

Tracking where each number came from and how it changed, so any result can be traced back. An optional reading.

Review Lesson 4
Retrieval-augmented generation

The technical name the readings give for answering from sources you provide instead of memory. Background only.

Review Lesson 1