Agentic AI · Module 3Lesson 6

Study explanation · Lesson 06 · 10 min

AI classifies, sheets calculate

A language model suggests categories and explains; the spreadsheet computes the totals. A formula can be clicked and checked, a typed number cannot, and flagged rows stay out of the confirmed total.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

Judgment and math are different jobs

The library puts the division bluntly: language models are for judgment, spreadsheets are for math, so don’t make language do math. The readings say the same of the sheet tools: AI suggests and explains, the sheet calculates.

Who does which job · Module 3 prompt library pp. 10-11, 15-16

The assistant: judgment

  • Suggests a category, with a confidence.
  • Explains what a row seems to be.
  • Flags what it cannot read, with a reason.

The sheet: math

  • Computes every total with a formula.
  • Shows its working when you click the cell.
  • Keeps flagged rows out of confirmed totals.

A formula is checkable. A typed number is just an assertion.

A formula is checkable

The final hands-on prompt adds a summary tab and asks for each category total as a spreadsheet formula, such as SUMIF over the clean ledger, never as a number the assistant types in. Anyone can click the cell and see exactly which rows fed the total.

The improved prompt · P5Add totals for each category using spreadsheet formulas (such as SUMIF) that reference the data table directly — do not type in a calculated number. Exclude any row flagged Needs review from the confirmed total and show it separately.

Key ideaA formula shows its working. A typed number is just an assertion.

Unconfirmed stays separate

Rows marked as needing review are excluded from the confirmed totals, and their amounts are shown on their own line as unconfirmed. The smudged receipt is therefore visible in the summary without being quietly averaged into the result.

  • The follow-up is a physical check: click a total and confirm the formula bar shows a real formula, not a static value.
  • The readings point to pivot tables and SUMIF as the simplest ways to build these totals yourself.

When the sources disagree

The last guardrail covers what no formula can settle: a date that could mean two things, or a note that contradicts an email. The assistant should stop, list exactly what it needs you to confirm, and leave the judgment with the person who can resolve it.

The guardrail · E4If a detail is ambiguous or two sources disagree, stop and ask me which one is correct instead of choosing on my behalf. List exactly what you need me to confirm.

Key takeaways

  • The assistant classifies and explains; the spreadsheet calculates.
  • Ask for totals as formulas, then click a cell to confirm.
  • Keep flagged rows out of confirmed totals and show them separately.
  • When sources disagree, the assistant should stop and ask, not choose.

Study explanation based on the supplied Module 3 prompt library and reading list for Agentic AI in Practice. The Module 3 lecture notes were not supplied, so nothing here is attributed to a lecture. Open the source notes above for page-level traceability.

Your study checkpoint

Ready to continue?

Mark the lesson complete once you have read it and tried its idea on something real.

Next · Module summary