Six lessons, six lines
The fastest way back into the module before you build your own knowledge layer.
| Lesson | In one line |
|---|---|
| 1 · One chat, the workspace | Confirm the folder and every connection, then point the assistant at the source. |
| 2 · Read before you act | Get a table of every file and what it needs before any action. |
| 3 · Draft, don’t send | Every send, booking or task waits for a person, and shows up in the real app. |
| 4 · Name the source | IDs, reliability and privacy for every file; unknown stays unknown. |
| 5 · Extract, transform, load | One clean row per record, raw beside cleaned, unreadable values flagged. |
| 6 · Sheets do the math | The assistant classifies, formulas calculate, flagged rows stay separate. |
Four guardrails for when things slip
The library keeps these as an optional extension, to use only when you catch the assistant, or yourself, slipping.
- No auto-send Nothing is sent, created or added without a draft and an explicit confirmation, for the rest of the session.
- Don’t guess a number Anything not clearly readable is marked for review with a reason, never estimated.
- Don’t blend unlabeled sources Every claim names its source ID; untraceable claims are unconfirmed.
- Stop and ask When a detail is ambiguous or sources disagree, list what needs confirming instead of choosing.
The end-of-module checklist
The library closes with the outputs you should have produced and saved, each with something specific to check.
- An Evidence Room folder holding an email, a task note, a bill, a bank export and receipts.
- A drafted reply confirming Thursday and promising the onboarding checklist, held rather than sent.
- A 30-minute onboarding sync and a bill reminder, both confirmed before creation.
- A task to send the checklist, due before the sync, confirmed before adding.
- A Source Registry with an ID, reliability, privacy and purpose for every file, and unknowns left unknown.
- A Clean Ledger with one row per transaction, a source ID on every row, and the smudged receipt flagged.
- A Summary tab with formula totals, flagged rows excluded and shown separately as unconfirmed.
The line to leave with
The module’s mindset is short enough to keep at the top of every session.
Key ideaName the source, then let the AI act. Every action traces back to a file, and every number traces back to a source.
Where to go next
Two pages carry the module forward.
- Hands-on: Lina’s knowledge layer The nine-prompt chain, step by step, with the weak and improved version of each.
- Further reading Five core readings, four practical references and four optional dives, mapped to the module’s stops.