No lecture notes were suppliedModules 1 and 2 were built mainly from lecture notes. For Module 3 only the prompt library and the reading list were supplied; the lecture notes, slides, hands-on input and the hands-on recording the library mentions were not. The lessons follow the library’s own foundation prompts, P0 to P5, which it heads “Foundation prompts from the lecture”, and nothing is attributed to the lecture itself.
The first hands-on prompt repeats the secondH1 is meant to show why acting before reading fails. Its printed improved version is word for word the same as H2’s. The site shows H1’s weak prompt and follow-up in Lesson 2, and gives the improved prompt once, as Step 1 of the hands-on.
An incomplete sentence in H3The rationale for the email-reply prompt ends: “The explicit “do not send it automatically” and cannot connect to gmail.” The sentence is incomplete. The site uses only the clear part of the rationale, naming the exact source and facts, and does not guess at the rest.
Two framings of the hands-onThe reading list describes the practical work as a personal finance report: extract transactions, build totals in Sheets and write the report in Docs. The prompt library’s chain is Lina’s Evidence Room: a reply, a meeting, a task, a reminder, then a registry, a ledger and totals, and it never drafts a Docs report. The hands-on follows the library; the reading page keeps the list’s own framing.
Stops, and no Stop 5The reading list maps itself to stops 1, 2, 3a, 3b, 4 and 6, with no Stop 5. The stops belong to lecture material that was not supplied, so the table pairing stops with lessons on the reading page is this site’s own.
A phrase carried over from Module 1The readings’ opening still says to use the practical references “while you build your Custom Assistant Specification”, Module 1’s deliverable, as Module 2’s list did. The rest of the list describes the references as tools for this module’s hands-on.
Gemini and Google Workspace hereModule 1’s tools were ChatGPT’s, Module 2’s were Claude’s, and Module 3 assumes Gemini connected to Drive, Gmail, Calendar, Tasks and Sheets. Each is reproduced as its own document’s recommendation at that document’s date. Nothing here claims how any product behaves today.
Lina’s week is fictionLina, Sara Mansour, the Henderson onboarding, Skyline internet, the CVS receipt and every amount and date belong to the library’s teaching scenario. Sara’s address uses a reserved example domain. The folder’s files were not supplied, so nothing here reconstructs their contents beyond what the prompts state.
The links are the course’s, not oursAll sixteen reading links were taken from the supplied readings PDF’s own link annotations. None was added, substituted or assessed here, and the list’s caveat about pages moving is reproduced on the reading page.
Checked against the two supplied documents.