The slides are not suppliedAs in Module 1, the notes accompany slides that are not part of this material. Nothing here is attributed to them, and no lesson claims to reproduce a lecture.
The Audit Gate Modes are named, not definedSection 7 lists “the Module 2 Audit Gate Modes” among the things you keep, alongside the exact Module 1 drafting instruction. No supplied document says what the modes are. The phrase is reported as the notes’ own and nothing is invented to fill it.
Prompts P1 and P3 are referenced, not suppliedThe hands-on input says to paste the brief where “Prompt P1/P3 asks for BRIEF TO REVIEW / BRIEF TO AUDIT”. Those prompt texts belong to the recording and are not in the material, so this site names the placeholders without reconstructing the prompts.
There is deliberately no draft to auditThe input ships the evidence pack and an empty placeholder: “Do not use a pre-written dummy report. The point of Module 2 is to audit the real output from Module 1.” The audit gate on this site therefore starts with an empty paste area and explains why.
The source pack is Module 1’s, unchangedAll five sources in the Module 2 input — the notebook, the standup notes, the project export, the four emails and the voice memo — are the Module 1 pack repeated. This site reuses that data rather than duplicating it, and says so on the hands-on page.
“Required checks” is never definedSection 5 says to stop when all required checks pass, without stating which of the eight are required. The rule is quoted and the gap is flagged; the choice is left to whoever runs the audit.
The three-section structure comes from your own briefCheck 6 asks whether the draft follows “the required three-section structure”, and check 5 names Lina and her chief of staff. Both details belong to the Module 1 drafting brief the auditor is checking against; the Module 2 notes never set out what the three sections are.
A passing audit is not an approvalSection 1 says the reviewer helps catch problems and a human still makes the final decision. That boundary is repeated in the lessons, in the audit gate’s verdict and on the summary, because the log’s PASS line is the easiest thing on the page to misread.
The judge is not an authorityOne of the module’s own optional readings is a study of AI judges’ length, position and self-preference biases, which the list summarises as a reminder that the judge is not an authority. The lessons carry that caution beside the three-judge sequence.
Claude here, ChatGPT in Module 1Module 2’s practical references are Claude projects, prompt engineering and system prompts, where Module 1’s were ChatGPT projects and custom GPTs. Both are reproduced as their own document’s recommendations at the date of that document, and neither is presented as required.
Five stops, seven sectionsThe reading list maps itself to five “stops” while the lecture notes use seven numbered sections. Both vocabularies are kept visible, with a table showing how they line up, rather than renaming the lecture’s sections to fit the readings.
One phrase carried over from Module 1The readings’ opening page still says to use the practical references “while you build your Custom Assistant Specification” — Module 1’s deliverable — while page 4 describes the same references as the tools for building the Compliance Auditor. This site follows page 4, which matches the rest of Module 2.
The finance examples are the notes’ ownThe invented subscription charge, the bank statement nobody sent and the two transactions behind “always overspends” are the notes’ illustrations of the four failure patterns. They are teaching examples, not advice.
The links are the course’s, not oursAll fifteen reading links were taken from the supplied readings PDF’s own link annotations. None was added, substituted or assessed here, and the list’s caveat about pages moving is reproduced on the page. Where Module 2 links a source at a different address than Module 1 did, each module’s page reproduces its own document’s link.
Checked against the three supplied documents.