Agentic AI · Module 1 · Reading
Further reading
The course’s own curated list, reproduced with what each source is for and which part of it to read. Every link is the module’s recommendation, not this library’s.
The list carries its own caveat about links: web pages move and get renamed over time, so if a link doesn’t resolve, search the title in quotes — the resource is usually easy to find under the same name. Links open in a new tab. They were taken from the supplied reading list and have not been assessed here.
Core readings
Read these after the lecture. The list calls them the minimum supporting readings, written for a general, non-technical audience, and estimates 60 to 80 minutes in total if you read only the sections noted.
IBM — What is a large language model (LLM)? (opens in a new tab)
Companion: AWS — What is an LLM? (alternative primer) (opens in a new tab)
A plain-language primer answering “what is an LLM” for a non-technical reader. Covers what they are made of, what they are good at, and where they fail, supporting Parts 2 and 3.
Read this part Read the opening sections on what an LLM is, training versus inference, and limitations. Skip enterprise-deployment and architecture deep-dives.
Stephen Wolfram — What Is ChatGPT Doing… and Why Does It Work? (opens in a new tab)
The clearest explainer of the “predict the next word, over and over” mechanism taught in Part 2. Makes prediction, training, and the difference from a search engine concrete.
Read this part Read the first third, from “It’s Just Adding One Word at a Time” through “The Idea of Embeddings”. The later maths is optional.
Anthropic — Prompt engineering overview (opens in a new tab)
The main reference for everything in Part 6: being clear and direct, giving examples, assigning roles, and shaping output — the same habits the module teaches.
Read this part Read the overview and the sections on clear instructions, examples, role prompting and output format. Skip the advanced and agentic sections for Module 1.
OpenAI — Prompt engineering guide (opens in a new tab)
A second, tool-neutral view of the same prompting ideas. Reinforces specificity, examples, and stating the format you want.
Read this part Focus on the general strategies and tactics for writing clear instructions. Skip API and code-specific details, which browser-based work does not need.
Anthropic — Effective context engineering (opens in a new tab)
The source of two key ideas in Part 5: that more context is not always better, and that the model has a limited attention budget. This is where “context rot” comes from.
Read this part Read for the core principle — find the smallest set of high-signal information that does the job. Skim or skip the later agent-orchestration details.
Anthropic — Interactive prompt engineering tutorial (opens in a new tab)
Hands-on practice turning weak prompts into structured ones. The best way to make the five ingredients stick is to try them.
Read this part Prioritise the early chapters on being clear and direct, assigning roles, using examples, and formatting output. The rest is optional.
Practical references
These are lookup references rather than assigned essays. Keep them open while you build your Custom Assistant Specification and decide where your standing brief will live.
GitHub — Awesome ChatGPT Prompts (opens in a new tab)
A widely used community collection of role-based prompt templates covering hundreds of jobs and scenarios, and tool-agnostic.
Read this part Scan for roles close to your task, copy the template, and tailor the role, goal, audience and format from the module’s five ingredients. Use it as a starting brief, not a finished one.
OpenAI — Projects in ChatGPT (opens in a new tab)
Where to save standing context: a project groups chats around one recurring task with shared custom instructions and reference files.
Read this part Read what projects are, how to set project-level custom instructions, and how to attach reference files.
OpenAI — Creating a custom GPT (GPT Builder) (opens in a new tab)
Companion: Open the GPT Builder (a paid account is required) (opens in a new tab)
The step up from projects: a saved, named assistant with its own role, instructions, examples and uploaded reference files — the Custom Assistant Specification made reusable and shareable.
Read this part Read “Creating a GPT” for how to fill in name, description, instructions, conversation starters and knowledge files.
Optional deeper dives
Useful, and deliberately not required for the quiz or the deliverables. Use them only after the core readings.
3Blue1Brown — But what is a GPT? Visual intro to transformers (opens in a new tab)
A visual, intuitive explainer of next-token prediction and how a model produces text one word at a time, matching Part 2’s mental model but going deeper.
Read this part Watch the first 15 to 20 minutes for the intuition of prediction. The later maths is optional.
Andrej Karpathy — Intro to Large Language Models (opens in a new tab)
A one-hour talk on what LLMs are, how they are trained, what they can and cannot do, and where they are going. Good for cementing the how-it-works and how-it-fails model.
Read this part Watch Part 1 end to end. The sections on the future of LLMs and on security are optional.
Anthropic — Building effective agents (opens in a new tab)
Extends Part 5’s idea that you can grow from one prompt, to a whole desk of context, to a repeating loop. The next step beyond a saved assistant specification.
Read this part Read for the conceptual progression from single prompts to structured, repeating workflows. Implementation details are optional.
Ethan Mollick — One Useful Thing (opens in a new tab)
A plain-language blog on working with AI as a collaborator. Reinforces the shift from oracle to teammate, and the “trust an intern?” test.
Read this part Browse recent posts on practical use, human oversight, and where AI helps or fails. There is no required section.
Where each one helps
Readings, mapped to the module.
| Module part | Best supporting reading |
|---|---|
| Part 2 — How an LLM works | Core 1 and Core 2; Optional 1 and 2 for deeper intuition |
| Part 3 — Strengths and blind spots | Core 1 (strengths and limits); Optional 4 on AI as a collaborator |
| Part 4 — Task breakdown | Core 3 and Core 6, on breaking work into clear, single-purpose prompts |
| Part 5 — Context engineering | Core 5 (signal, not volume); Practical 1 and 2 for templates in action |
| Part 6 — Prompting | Core 3, 4 and 6; Practical 1 for browseable prompt libraries to adapt |
| Part 7 — Deliverables | Practical 2 and 3 for saving the specification; Optional 3 for what comes after |