Original source guide

Final Course Project — Automate, govern, and prove an end-to-end agentic workflow

Where each lesson comes from, what was not supplied, and the places where the material needs a careful reading.

The two sources

The final course project assignment (4 pages, “Final-Course Project – Aligned”) and one learner’s step-by-step execution guide (version 1.0, prepared 11 October 2026), for Agentic AI in Practice, American University of Beirut. Assignment page numbers are PDF pages; the guide is cited by step. The documents themselves are not republished here.

Listening

The project’s lessons and worked example play a recorded AI narration voice, generated in advance from the page text. If a lesson changes after it was recorded, the reader falls back to your device’s own voice. Back to the lessons

Page map · final course project assignment and step-by-step guide
PageSource
1 · The project in one sentenceAssignment pp. 1, 3 (title, assessment, one-sentence goal, starting point, passing rule)
2 · The eight required partsAssignment pp. 1-2 (required system 1-8)
3 · What to submit, and what to logAssignment pp. 2-4 (six items, run log fields, handoff check)
4 · How it is judgedAssignment pp. 3-4 (competency rubric, passing rule, final handoff check)
Worked example, step by stepStep-by-step guide, version 1.0, Steps 1-18, troubleshooting and reference notes

Lesson 01

The project in one sentence

Take the manual workflow from the mid-course project and turn it into a bounded automation or agentic workflow, then prove it follows an explicit policy, pauses for human judgment, handles failure honestly and leaves an auditable trail.

Open the lesson
Title, assessment and one-sentence goal

Competency-based, Met or Not Yet Met; prove operation and control.

Assignment p. 1
Starting point

Reuse the use case, keep the evidence, fit the tool stack.

Assignment p. 1
Passing rule

A workflow that runs but cannot be governed is not a passing final project.

Assignment p. 3

Lesson 02

The eight required parts

The system has eight parts: a blueprint, a bounded automation, an agent policy, a human approval gate, responsible-AI controls, failure design, three proof runs and a one-page SOP.

Open the lesson
Required system 1-2

Workflow blueprint and bounded automation.

Assignment p. 1
Required system 3-8

Agent policy, approval gate, responsible AI, failure design, proof runs and SOP.

Assignment p. 2

Lesson 03

What to submit, and what to log

Six numbered items make up the submission, from the blueprint to a 400 to 600-word reflection, and every run must log its identity, inputs, decisions, approval, failures and output.

Open the lesson
What to submit

The six numbered items and their accepted formats.

Assignment p. 2
Minimum run log fields

Identity, inputs, decisions, approval, failures, output.

Assignment p. 3
Final handoff check

Final output separated from logs, test data and instructor-only evidence.

Assignment p. 4

Lesson 04

How it is judged

Six criteria, each Met or Not Yet Met, and all six must be Met. The handoff check then makes sure the teaching team can open everything, nothing secret is exposed, and approval was never silent.

Open the lesson
Competency rubric and passing rule

Six criteria; all must be Met.

Assignment p. 3
Final handoff check

Access, secrets, explicit approval, same version, SOP stop and escalation, separated output.

Assignment p. 4

Source appendix

Where to read with care

Read with care

The worked example is one learner’s plan

The step-by-step guide was written for one learner’s project, a Firebase Delivery-Readiness Research Brief built as a local Python controller. Its own first page says it is an implementation guide, not completed run evidence or a submission. The site keeps that distinction: expected states and results are labelled as expected, never as observed.

Names are removed

The guide names its author and their business. They are replaced by “the consultant” in the site’s text and by “[me]” inside quoted prompts, and a check fails the build if either name appears. The prompts are otherwise unchanged.

Course requirement or design choice

The assignment sets the eight parts, six items, log fields and rubric. The guide’s folders, Python route, G0 and G1 gates, numeric limits and run IDs are its own design choices, and it says so. The lessons teach the assignment; the worked example shows one way to meet it.

What the guide could not see

The guide says it inspected the assignment, the Stage 1 inventory, the Stage 3 knowledge layer and an earlier plan, but not the full K01 and S00 files or the later acceptance package. Its Step 4 has Claude read those files locally. The site repeats that limit and fills no gap.

Make.com or an equivalent

The assignment names Make.com as the reference implementation and accepts an equivalent platform if the same controls are visible. The worked example chooses a local source export as its equivalent; Modules 5 and 6 show the Make.com route.

Tools and models, at the guide’s date

The guide reviewed its Claude Code, SDK, pricing and model references on 11 October 2026 and warns that model IDs, entitlements and interfaces change. Nothing here claims how any product behaves today.

The deadline

The guide gives Sunday, 1 November 2026, 11:59 PM, planned in the Asia/Beirut timezone, and says the learning platform’s displayed deadline and timezone remain authoritative.

Checked against the supplied assignment and guide.

What not to take away

The lessons actively work against these misreadings:

  • A workflow that runs well passes, even if it can’t be governed.
  • A written policy counts as an enforced one.
  • Silence after an approval request means yes.
  • Retrying until it works is good failure handling.
  • A plausible estimate is an acceptable fallback for missing data.
  • An AI audit that passes is a human approval.
  • Three proof runs can use different versions if each one worked.
  • A guide’s expected result is evidence of a real run.

Study-guide synthesis; each item is addressed in the lessons.