Six numbered items
The assignment numbers the submission so each piece of evidence has one home.
| Item | Required evidence | Format |
|---|---|---|
| 01_Workflow_Blueprint | A diagram plus a documentation table for every stage, gate, owner and failure path | PDF or DOCX |
| 02_Automation | A shareable scenario or workflow link or export, plus a short setup note, with secrets removed | Link or export, plus a README |
| 03_Governance_SOP | A one-page SOP with goal, access, approval, escalation, retry and fallback, monitoring and stop rules | PDF or DOCX |
| 04_Run_Evidence | Three proof runs: normal success, policy or approval stop, and failure, recovery and escalation | PDF, DOCX or sheet |
| 05_Final_Output | The actual audience-facing result from the approved normal run | PDF, DOCX or link |
| 06_Final_Reflection | 400 to 600 words on design choices, verification, rejected AI behavior, risks and future monitoring | PDF or DOCX |
The minimum run log
Every run records six groups of fields, so a reviewer can follow it from trigger to stop.
| Field | What to record |
|---|---|
| Run identity | Run ID, date and time, operator, workflow version and policy version |
| Inputs | Source IDs or file names, and any redaction applied |
| Decisions | Routes chosen, checks performed, and why |
| Approval | What the human saw, who approved, and the explicit decision |
| Failures | The error, retry count, fallback, escalation recipient and final status |
| Output | Output location, audit verdict, remaining caveat and stop confirmation |
Keep the output apart
The final output is what the audience reads. The assignment’s handoff check asks for it to be clearly separated from logs, test data and instructor-only evidence, so the reader never has to look past the evidence to find the result.
Read with careThe reflection limit for the final project is 400 to 600 words, which is longer than the mid-course limit.
Key takeaways
- Submit six numbered items, from the blueprint to the reflection.
- Remove secrets from every export.
- Log run identity, inputs, decisions, approval, failures and output for every run.
- Keep the audience-facing output apart from logs and test data.