Agentic AI · Final projectLesson 2

Study explanation · Lesson 02 · 12 min

The eight required parts

The system has eight parts: a blueprint, a bounded automation, an agent policy, a human approval gate, responsible-AI controls, failure design, three proof runs and a one-page SOP.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

Design and build

The first two parts are drawn before anything is built, then implemented once.

Required system, parts 1-2 · Assignment p. 1
PartWhat it must show
1 · Workflow blueprintThe trigger, inputs, processing steps, decision gates, outputs, owners and tools, stop condition and failure paths, before building
2 · Bounded automationOne complete run with a clear trigger, condition, action, approval and log. It may not loop indefinitely.

Policy and the human gate

The next two parts decide what the system may do, and when it must stop and ask.

Required system, parts 3-4 · Assignment p. 2
PartWhat it must show
3 · Agent policyThe system’s goal, permitted tools and data, approval rules and escalation rules, in plain language
4 · Human approval gateA pause before any action that spends, sends, publishes, deletes or materially changes an external system. Approval must be an explicit, recorded yes.

Key ideaSilence is never approval. The yes must be explicit and recorded.

Controls and failure

Two parts make the system safe to run and honest when it breaks.

Required system, parts 5-6 · Assignment p. 2
PartWhat it must show
5 · Responsible AI controlsPrivacy and data minimization, fairness and tone checks where relevant, traceability, and security against untrusted instructions in source data
6 · Failure designA bounded retry, an honest fallback, an escalation path and a monitoring or logging step. Never hide missing data or fabricate a replacement.

Proof and handover

The last two parts prove it works and let someone else run it.

Three proof runs on one version · Assignment p. 2

Normal success

  • One bounded run completes.
  • A human approves explicitly.
  • A usable result and a complete log.

Policy or approval stop

  • The run reaches the gate.
  • Policy or a human says no.
  • Nothing is released.

Handled failure

  • A bounded retry.
  • An honest fallback.
  • A visible escalation.

All three must use the same workflow and policy version.

Required system, parts 7-8 · Assignment p. 2
PartWhat it must show
7 · Proof runsOne normal success, one action paused or blocked by policy or approval, and one failure that retries or falls back and escalates as designed
8 · One-page SOPHow to run, supervise, approve, recover and stop the system, so another careful operator can use it

Key takeaways

  • Draw the blueprint before building, and implement one bounded run.
  • Write the policy in plain language: goal, tools and data, approval, escalation.
  • Pause before anything that spends, sends, publishes, deletes or changes an external system.
  • Retries are bounded, fallbacks honest, and missing data never invented.
  • Prove success, a policy stop and a handled failure, and hand over a one-page SOP.

Study explanation based on the supplied final course project assignment for Agentic AI in Practice. Open the source notes above for page-level traceability.

Your study checkpoint

Ready to continue?

Mark the lesson complete once you have read it and tried its idea on something real.

Next · Lesson 3