Agentic AI · Final project reference
Glossary
Short definitions as the module uses them, each linked to the lesson it comes from.
- Met / Not Yet Met
The project’s competency-based verdict for each of the six criteria; all six must be Met.
Review Lesson 4- Operation and control
The assignment’s bar: the system must both work and be governable.
Review Lesson 1- Reference implementation
Make.com, the course’s default build; an equivalent platform is fine if the same controls are visible.
Review Lesson 1- Workflow blueprint
The diagram and documentation table showing trigger, inputs, steps, gates, outputs, owners, stop condition and failure paths.
Review Lesson 2- Bounded automation
A fixed sequence with explicit attempt, time and action limits and a stop condition.
Review Lesson 2- Human approval gate
A pause before any action that spends, sends, publishes, deletes or changes an external system, released only by an explicit recorded yes.
Review Lesson 2- Honest fallback
A failure result that says what is missing and stops, instead of inventing a replacement.
Review Lesson 2- Proof runs
Three runs on one version: a normal success, a policy or approval stop, and a handled failure.
Review Lesson 2- One-page SOP
How to run, supervise, approve, recover and stop the system, on one readable page.
Review Lesson 2- Run log
The minimum record per run: identity, inputs, decisions, approval, failures and output.
Review Lesson 3- Runtime enforcement
The program checks a rule before acting; a prompt saying “be careful” is not enough.
Review Lesson 4- Fail closed
When required evidence, approval or a control is missing, the system does not release.
Review Lesson 4- G0 and G1
In the worked example, the execution gate before any API request and the release gate before any output.
Review Lesson 4- Payload fingerprint
A hash that detects any change to the exact file or packet a person reviewed.
Review Lesson 4- Idempotent release
Repeating a release decision never creates a second delivery.
Review Lesson 4- Fault injection
A clearly labelled artificial error used to test the real failure path, never claimed as a real outage.
Review Lesson 4- Audit trail
Linked records of inputs, processing, checks, human decisions, outputs and failures.
Review Lesson 3- Freeze
A manifest binding code, dependencies, policy, prompts, schemas and inputs, so the three proof runs share one version.
Review Lesson 4