The six criteria
Each criterion has a Met description and a Not Yet Met description.
| Criterion | Met | Not Yet Met |
|---|---|---|
| Workflow design | Blueprint and implementation match; inputs, outputs, gates, owners, stop rule and failure paths are explicit | The live system departs from an undocumented or incomplete blueprint |
| Automation quality | One bounded end-to-end run completes and produces a usable result with a complete log | The workflow is manual in essential places, loops without a bound, or can’t complete reliably |
| Governance | Goal, access, approval and escalation policies are enforced at runtime | Policies are only written notes, or the live flow can bypass them |
| Responsible AI | Privacy, traceability, security and relevant fairness or tone checks are visible in design and evidence | Sensitive data, untrusted instructions or unsupported claims pass without control |
| Failure handling | Retry is bounded, fallback honest, escalation visible, and monitoring can reveal repeated problems | Failures are hidden, ignored, retried forever, or replaced with invented data |
| Proof and ownership | Three proof runs, an operator-ready SOP and a candid reflection show you understand and own the system | Evidence is incomplete, or you can’t explain key actions and controls |
Key ideaAll six criteria must be Met. A workflow that runs but cannot be governed is not a passing final project.
Written policy is not enforced policy
The governance criterion is the one most easily misread. A policy that lives only in a document, or one the live flow can route around, is Not Yet Met. The rule has to be checked by the running system before it acts, as Module 6’s governance checkpoint did.
The final handoff check
The assignment closes with six things to confirm before you hand it in.
- The teaching team can open every link without requesting access.
- Secrets, tokens, credentials and personal data are removed from exports and screenshots.
- The human approval is explicit and recorded; silence is never treated as approval.
- The three proof runs use the same workflow and policy version.
- The one-page SOP names how to stop the system and who receives escalation.
- The final output is clearly separated from logs, test data and instructor-only evidence.
Key takeaways
- Six criteria, each Met or Not Yet Met, and all six must be Met.
- Policies must be enforced at runtime, not just written down.
- Failures must be bounded, honest, visible and monitored.
- The three proof runs must share one workflow and policy version.
- Check access, secrets, approval, versions, the SOP and output separation before submitting.