Agentic AI · Module 4 reference

Glossary

Short definitions as the module uses them, each linked to the lesson it comes from.

Workflow layer

The module’s name for making a task visible as one repeatable shape, on top of the knowledge layer from Module 3.

Review Lesson 1
The wiring

The notes’ image for the person who copies output between chats and holds the order of the steps in their head.

Review Lesson 1
Decomposition

Seeing a task as a machine with a fixed shape instead of a pile of remembered steps.

Review Lesson 1
Four moments

Input, process, decision and output: the four kinds of moment every workflow is built from.

Review Lesson 1
Decision moment

A fork based on a check, such as an audit verdict, a confidence level or whether a human is needed.

Review Lesson 1
Mental Model card

One of the course’s short summary cards. Module 4 adds cards 16 to 20.

Review Lesson 1
Workflow diagram

Boxes for steps, arrows for what flows between them and a diamond for each decision.

Review Lesson 2
Documentation table

The diagram’s twin: one row per step with its input, output, dependency, failure point and owner.

Review Lesson 2
Trigger

What starts a step.

Review Lesson 2
Dependency

An input a step needs before it can start, usually another step’s output.

Review Lesson 2
Failure point

The way a step typically fails, named in advance, such as a missing file or a wrong recipient.

Review Lesson 2
Owner

Who does a step and who reviews it.

Review Lesson 2
Chaining

An ordered sequence in which each step’s output is the next step’s input.

Review Lesson 3
Routing

Sending the work down a different path depending on a check, such as pass or fail.

Review Lesson 3
Parallelization

Running independent steps at the same time, by sectioning into subtasks or by voting across several runs.

Review Lesson 3
Orchestrator and workers

One step splits a big task, hands each part to a worker and combines the results.

Review Lesson 3
Evaluator and optimizer

One step drafts, another grades it against a standard, and the first revises until it is good enough.

Review Lesson 3
Pattern overkill

A design more elaborate than the task needs, such as an orchestrator for two steps or a loop with no stop condition.

Review Lesson 3
Vibe coding

Describing a workflow in plain language and letting an AI turn it into a structured plan or implementation.

Review Lesson 4
Verify the translation

Checking an AI-built plan for missing decision points, invented steps and missed dependencies.

Review Lesson 4
Loop engineering

Designing an iterative, goal-based system once, instead of prompting turn by turn and being the loop yourself.

Review Lesson 4
Schedule

A loop’s heartbeat, which starts it without you, such as every Monday at 8am.

Review Lesson 4
Written standards

The rubric and goals, stored where the loop reads them on every run.

Review Lesson 4
Maker and checker

One part drafts and a separate part grades, so nothing grades its own homework.

Review Lesson 4
Stop rule

The condition that ends a loop, such as three rounds or zero goals failing, whichever comes first.

Review Lesson 4
Station

A numbered step in the assembled workflow. Stations that share a number run as a parallel lane.

Review Lesson 5
Handoff

The exact thing that crosses an arrow from one station to the next.

Review Lesson 5
Fail path

Where the work goes when a router’s check fails, such as back to revision.

Review Lesson 5
Assembly protocol

Number every station, name every handoff, give routers fail paths and loops stop conditions, and assign a tool to each station.

Review Lesson 5
Output contract

The hands-on file listing every file the workflow must produce, and the exact final line of the audit log.

Review Lesson 5
REVIEWED - BLOCKED

The honest result when a required check still fails after the stop rule ends the loop; a person decides next.

Review Lesson 4