Agentic AI · Module 4 practice

Make the shape visible.

These activities are based on the supplied Module 4 material. They practise judgment about designing a workflow an AI can build and run; they say nothing about what any particular tool can do today.

Decide what you would do

The audit nobody ran

Last week you drafted, categorized, audited and delivered Lina’s report. This week you were rushed, and the report went out without an audit.

What does the module say this tells you?

Knowledge check

Check what stuck.

Choose the strongest answer from the supplied Module 4 material.

0/15 answered
01According to the notes, what is the sign that a task needs a workflow?
02Which list gives the four moments of any workflow?
03Which of these is a decision moment?
04What four things should you name for every step in the diagram?
05In the documentation table, what does the audit gate depend on?
06Draft, audit, then ship on a pass and revise on a fail. Which pattern is that?
07What is voting, as a form of parallelization?
08When does the notes’ chooser point to orchestrator and workers?
09Which of these is pattern overkill?
10Which is not one of the five things the AI needs from you to build a workflow?
11Why does an evaluator and optimizer loop need rules, not just a description?
12In the anatomy of a loop, what does maker and checker mean?
13What is the notes’ worked stop rule?
14What does a parallel lane have to be?
15Which tool do the notes assign to the audit station?