01 What does the final-project brief say you are not doing?Adding product features Writing documentation Using AI tools Changing the CI configuration
02 Which list matches the five verbs the brief uses for what AI helps you do?Plan, build, deploy, monitor, scale Harden, verify, document, review, govern Ask, inspect, run, test, refine Draft, merge, release, tag, announce
03 The brief requires “the required docs/ files”. What do these pages say about which files those are?They are release-evidence.md, final-ai-review.md and ai-playbook.md, as the brief lists Only README.md counts as documentation They are listed in a separate assignment file that was not supplied, so the exact list is unknown here Any Markdown file in docs/ satisfies the requirement
04 A CI workflow’s test step ends with “pytest || true”. Why does Module 4 say to reject it?It runs the tests twice It requires a secret token It only works on Windows runners It turns a failing test command into a successful one, so CI stays green when tests fail
05 What best proves a CI workflow actually protects the project?A green run, then a deliberately broken test turning it red, then green again without changing the workflow A green badge on the README The workflow file passing a YAML linter The workflow finishing in under a minute
06 A Dockerfile builds successfully. Which further check matters most for the security story Module 4 describes?The image tag includes the date whoami inside the running container returns app, not root The image is under 100 MB The container starts with --reload
07 You find an API key committed months ago and deleted in a later commit. What is the right understanding?It is gone, because it is not in the current tree It only matters if the branch is merged to main It is still in the public history, so it must be treated as exposed and rotated, and history cleaned only with explicit approval Adding .env to .gitignore removes it
08 Under Module 5’s risk levels, a private production log containing customer e-mails pasted into an AI tool is:Low Medium Not a governance concern High
09 You could not open the frontend in a browser before writing the release evidence. How should that check be recorded?NOT RUN or NEEDS OWNER VALIDATION, with exact steps PASS, because the tests pass PASS, because nothing in frontend/ changed Leave it out of the document
10 Why should evidence name the commit a CI run or test run refers to?GitHub requires it for public repositories A result is evidence about one commit; a later change can make it say nothing about the submitted code It makes the document longer It hides which tests were skipped
11 In a Module 4 review log, an AI comment misreads the code and invents a bug that is not there. Which bucket fits?Useful Noise Wrong Valid
12 Your security review’s manual scan found nothing that the AI had not already found. What is the honest way to record it?Invent a minor finding so the You-only column is not empty Copy one AI finding into the You-only column Delete the reconciliation section Leave You-only empty with a clear note on what you checked and found
13 A Valid finding needs a design decision about field semantics and several new tests. The brief forbids new features. What is a sound release choice?Either a minimal verified fix with regression tests, or a backlog item with owner, next action and how completion is verified Ignore it, since it is not a feature Rewrite the storage layer to remove the class of bug Mark it Noise so it does not need action
14 What makes a line-by-line trace of a generated block good evidence of ownership?It shows the AI wrote the code It shows you can say what each line does, why it exists and what would break without it, and it marks anything you still cannot explain It replaces the need for tests It proves the code is secure
15 Your ownership statement says “the application code is unchanged”, but you later added a validator to app/models.py. What should you do?Nothing; the statement was true when written Remove the validator to keep the statement true Rewrite the statement so it matches the evidence, and explain the change Move the statement to the README
16 What exactly do you submit for the final project?A zip of the repository A PDF of the docs/ folder The CI run link Only the public GitHub repository URL
17 What does Not Met mean for this project?A low numeric grade that still lets you continue One or more required competencies were not demonstrated, and you will be required to revise and resubmit The facilitator will send line-by-line comments You must restart the course
18 README.md and AGENTS.md both describe the project. What is the key difference in who they serve?README.md is for graders only; AGENTS.md is for users They are the same file under two names README.md is for a human teammate; AGENTS.md gives an AI agent the stack, commands, rules and boundaries AGENTS.md lists the authors of the project