AI-Assisted Coding · Module 1 reference

Glossary

Short definitions as the module uses them, each linked to the lesson it comes from.

Junior collaborator

The module’s model of an AI assistant: fast and useful, writes the happy path, fills gaps with guesses, and doesn’t own the work.

Review Lesson 1
Senior developer role

Your role: give context, inspect every line, run and test the output, refine, and take responsibility for the result.

Review Lesson 1
Reflection log

For each hands-on activity, one thing AI got right, one thing you corrected, and one assumption AI made.

Review Lesson 1
Pattern completion

How an assistant produces output: likely next tokens based on learned patterns, without running or checking the code.

Review Lesson 2
Runtime context

Your terminal, logs, database, environment variables and failures, which the assistant can’t see unless you provide them.

Review Lesson 2
Uncertainty signal

Something that would show when an answer is unreliable. Assistants lack a reliable one: right and wrong answers sound equally confident.

Review Lesson 2
Hallucinated API

A method, module or function that looks like it should exist, often in the library’s own style, but doesn’t.

Review Lesson 2
Non-functional requirements

Validation, response models, status codes, structured errors and edge cases: what a happy-path answer usually leaves out.

Review Lesson 2
Production-aware

In Module 1, the habit of thinking about validation, errors and edge cases, not a claim that the code is production-grade.

Review Lesson 2
Shallow business logic

Syntactically correct code that misses the real rules, such as a status setter that accepts any value.

Review Lesson 2
Prompt as specification

Treating a prompt as a compact technical spec, not a search query or casual request.

Review Lesson 3
Four-part anatomy

Role or context, task, constraints and output format: the parts every structured prompt carries.

Review Lesson 3
Negative constraint

A statement of what the output must not include, such as no auth, no logging or no new libraries.

Review Lesson 3
Targeted follow-up

A refinement prompt that names the exact gap and what must stay the same, instead of accepting or discarding the draft.

Review Lesson 3
Role prompting

Assigning a specific professional lens, such as a senior FastAPI developer reviewing for validation and status codes.

Review Lesson 4
Few-shot prompting

Giving one or more examples to imitate; the example sets the quality ceiling as well as the format.

Review Lesson 4
Constraint-based prompting

Listing what the output must and must not include, to prevent scope creep, extra dependencies and wrong shapes.

Review Lesson 4
AI interaction loop

Ask, inspect, run, test, refine: the module’s core workflow, for code and non-code artifacts alike.

Review Lesson 4
Task Tracker

The course project: a simple task board on a FastAPI API with a simple web frontend, kept small so the workflow stays visible.

Review Lesson 5
Scope creep

Features or infrastructure the task didn’t ask for, such as auth, Docker or a database, appearing in AI output.

Review Lesson 5
Stateless mental model

Every new conversation starts from zero unless you provide context or work in a persistent project.

Review Lesson 6
Context block

A short, reusable paragraph with the project, stack, fields, scope and loop, pasted at the start of a conversation.

Review Lesson 6
Context contamination

Unrelated earlier work bleeding into a new task; a new chat avoids it.

Review Lesson 6
Judgment = think; recall = skip

The module’s rule for reasoning modes: use deeper thinking for trade-offs and rules, skip it for boilerplate and lookups.

Review Lesson 6
User story

A requirement in the form “As a [role], I want [feature] so that [benefit],” with acceptance criteria.

Review Lesson 7
Acceptance criteria

Specific, testable conditions that make a story buildable and checkable.

Review Lesson 7
Status transition rule

Which status changes are allowed; the documents’ rule is that Done cannot move back to ToDo or InProgress.

Review Lesson 7
Architecture Decision Record (ADR)

A short record of a decision; in Module 1, one paragraph in your own words with the choice, criteria, rejected assumptions and a risk.

Review Lesson 8
Evaluation criteria

Simplicity, testability, local run or deployability, and familiarity: the four lenses for comparing architectures.

Review Lesson 8
Project skeleton

A minimal runnable structure: folders, requirements.txt, app/main.py, GET /health, config and README, with no CRUD yet.

Review Lesson 9
Health endpoint

GET /health, returning HTTP 200 with JSON such as status and timestamp: the skeleton’s proof that it runs.

Review Lesson 9
Exact-error diagnostic

A debugging prompt carrying the exact command, error, file tree and relevant files, as C3 does.

Review Lesson 9