AI-Assisted Coding · Module 3 practice

Verify before you trust.

Questions and scenarios on building the board, the modal, safe refactoring and evidence-based debugging. Each answer cites the page it comes from.

Decide what you would do

The route summary with a login route

You ask Copilot to list the routes in app/main.py. It lists the five task routes, a /health route, and POST /login. You never built authentication.

What is the best next move?

Knowledge check

Check what stuck.

Choose the strongest answer from the supplied Module 3 material.

0/18 answered
01According to Part 1, what does correctness include once the Task Tracker has a frontend?
02The board lets a user drag a Done card to To Do, and the backend replies 422. What does the source-of-truth rule say?
03When is the VS Code + Copilot setup complete, according to Part 2?
04The assistant says CORS is configured in app/main.py. How do you check that claim?
05Why does the setup checklist insist on opening the Task Tracker repo itself rather than a parent folder?
06Which order does the module recommend for building the board?
07Your board shows the column label “In Progress”. What value should a PATCH send for that column?
08What should happen when a user drops a card back into the column it came from?
09The console says GET /tasks was blocked by CORS policy. Which fix matches the notes?
10A user submits the modal with a title of three spaces. What should happen?
11In edit mode, the backend rejects a status change with 422. What should the modal do?
12When should every item in the behavior contract pass?
13A refactor diff replaces several addEventListener calls with a re-render that sets innerHTML. Why is that a red flag?
14After an accepted refactor, the empty-title check stops working. What is the recommended next move?
15You break the transition rule on purpose and the new test still passes. What does that tell you?
16A test expecting 422 fails because the code now returns 200. Which suggested fix is a cause fix?
17Why does the test loop start by asking the assistant to brainstorm edge cases without code?
18What goes on the “Evidence” line of the four-line debugging log?