AI-Assisted Coding · Module 4 reference
Glossary
Short definitions as the module uses them, each linked to the lesson it comes from.
- Delivery layer
The engineering artifacts around an app, CI, containers, documentation, review and decision notes, that let it be shared, maintained and shipped.
Review Lesson 1- Ask → inspect → run → test → refine
The core loop from earlier modules. It stays the same across tools; only the scope, and the cost of skipping a step, changes.
Review Lesson 1- AI surface
Where an AI tool works: the line (Copilot), the file or visible project (Cursor), or the whole repository and shell (Claude Code).
Review Lesson 1- Copilot
In the notes, line-level autocomplete for small functions and repetitive code. Verify the exact code it inserts.
Review Lesson 1- Cursor
In the notes, IDE chat for file- or project-level edits over visible code. Review its diffs and run the project.
Review Lesson 1- Claude Code
A terminal agent that can read the repo, plan, edit several files and run commands such as pytest, Docker, git or gh.
Review Lesson 2- CLAUDE.md
Project memory for the agent: stack, run and test commands, architecture, business rules, UI states, CORS notes and do-not rules.
Review Lesson 2- /init
The slash command that drafts CLAUDE.md. Its output is a draft to correct by hand, not a deliverable.
Review Lesson 2- /status
The slash command used to confirm the session context before working.
Review Lesson 2- Plan mode
A safety mode where Claude proposes a plan before editing, so you can inspect the intended steps first.
Review Lesson 2- Permissions
Approval gates before edits and shell commands. Reads are lower risk; writes and commands need conscious approval.
Review Lesson 2- @file reference
A way to pull a specific file, such as @app/main.py, into context when an answer must be checked against code.
Review Lesson 2- Do-not rules
The CLAUDE.md section that forbids unapproved scope: no auth, database, unrelated UI changes, deployment steps or secrets.
Review Lesson 2- Continuous Integration (CI)
Running the test suite automatically on push and pull request, so broken code is harder to merge unnoticed.
Review Lesson 3- False green
A CI run that passes while tests fail or never run, for example because of continue-on-error, || true or --exit-zero.
Review Lesson 3- continue-on-error
A workflow setting that lets a failing step appear acceptable. The module rejects it.
Review Lesson 3- Green → red → green
The CI proof: a passing run, a deliberate failing run from one broken test, and a restored passing run without changing the workflow.
Review Lesson 3- Multi-stage build
A Dockerfile with a builder stage for dependencies and a runtime stage that copies only what is needed to run.
Review Lesson 4- Slim base image
An explicit, small runtime base such as python:3.11-slim, used instead of a floating latest tag.
Review Lesson 4- Non-root user
An app user set with USER app before CMD; docker exec tt-dev whoami should return app, not root.
Review Lesson 4- .dockerignore
The file that keeps .env, .git, virtual environments, caches and build artifacts out of the build context and the image.
Review Lesson 4- Docker security log
Three lines confirming a non-root user, a slim runtime base and no baked secrets, filled from real command output.
Review Lesson 4- Google-style docstring
A docstring with a summary, Args, Returns, Raises and, for route handlers, examples.
Review Lesson 5- Claim-vs-reality log
A record of each documentation claim that did not match the code: what AI claimed, what the code does, and the resolution.
Review Lesson 5- [VERIFY]
The library’s marker for anything Claude is unsure of, used instead of a guess.
Review Lesson 5- Useful
A review comment that finds a real bug, risk, missing test, misleading doc or maintainability issue. Verify it, then fix or file a follow-up.
Review Lesson 6- Noise
A review comment that is technically fine but not worth acting on. Skip it and record why.
Review Lesson 6- Wrong
A review comment that misreads the code, invents a problem or ignores context in another file. Do not fix it; record the misunderstanding.
Review Lesson 6- Technical decision note
A short record under docs/decisions with Context, Decision, Alternatives Considered, Trade-offs, Consequences and Open Questions.
Review Lesson 7- Tool-fit reflection
The closing comparison of Copilot, Cursor and Claude Code by task type, based on your evidence and without naming a single winner.
Review Lesson 7