Design Principles · Week 1 practice

Choose every image on purpose.

Sixteen questions and seven situations from Week 1’s imagery decks. Each answer cites the deck and slide it comes from.

Decide what you would do

The café with the dark photos

A new café’s brand uses pale sage green, white and light wood. The owner sends you moody, dark, warm-brown barista photos found online for the homepage.

What do you recommend?

Knowledge check

Check what stuck.

Choose the strongest answer from the supplied Week 1 material.

0/16 answered
01According to the Week 1 definition, what makes something design rather than decoration?
02The reflection slide shows a teapot with its spout and handle on the same side. What point does it make?
03A charity homepage is redesigned from a crowded grid of boxes into one hero message with a short menu of actions. Which effect of design does the clearer action menu most directly serve?
04In the design thinking diagram on the slide, why do arrows run back from Test and Implement to earlier stages?
05What does the deck say non-designers bring to a design project?
06The imagery deck says people form an opinion of an interface in “0.05 seconds”. How should you use that figure?
07Two versions of a photo of a figure on a sea cliff are shown with a grid drawn over them. What makes the preferred version stronger?
08Why does the deck recommend square photos for mobile designs?
09A brand uses fresh greens and whites. Which of the deck’s tips helps you get images that match?
10What does “consider the temperature of the photograph” mean when matching images to a brand?
11According to the deck, what is the first step in incorporating imagery into the design process?
12You want to know which of two hero images leads more visitors to click “Book now”. Which method fits best?
13An image-size dialog shows 6253 × 4169 pixels at 300 pixels per inch, or 52.94 × 35.3 cm. What happens if you lower the resolution to 150 pixels per inch without resampling?
14You recolor and reshape one icon in a set of twelve. What matters most for “design cohesiveness”?
15What does “royalty-free” mean, as the deck describes it?
16You find the perfect landscape photo, but the preview is covered with “COPYRIGHT” watermarks. What is the right move?