Design Principles · Week 4 practice

See the space, find the grid.

Sixteen questions and seven design situations on negative and positive space and grid systems. Each answer cites the deck and slide it comes from.

Decide what you would do

The event poster with nowhere to put the title

A client sends a busy photograph of a festival crowd with a clear blue sky across the top third. They want the event title set as large as possible across the middle of the photo.

What do you recommend?

Knowledge check

Check what stuck.

Choose the strongest answer from the supplied Week 4 material.

0/16 answered
01Which description of negative space best matches the deck?
02In the improved moon poster, the text sits on a dark night sky. Why is that still “white space”?
03What made the first version of the moon poster hard to read?
04A designer adds space around a single call-to-action button so it stands out without being made bigger. Which technique from the deck is this?
05According to the deck, what is positive space?
06The chocolate home page shows one headline, one line of text and two buttons over a calm photo. What does the deck say this achieves?
07What does the deck mean by calling positive and negative space a “visual dialogue”?
08What does Rubin’s vase, shown in three colorings, demonstrate?
09Which is the deck’s definition of a grid system?
10An exercise figure shows evenly spaced vertical bands and evenly spaced horizontal bands crossing the whole page, making a checkerboard of equal cells. Which grid is this?
11An exercise figure shows evenly spaced vertical bands running from top to bottom, with no horizontal divisions. Which grid is this?
12An exercise figure shows one large field filling the page, with only a thin margin at each side. Which grid is this?
13A news front page gives its lead story a large area and arranges smaller stories in narrower, shorter areas. Which grid type fits best?
14In the review card shown without a grid, every element is still present. Why does it look worse?
15What is a grid breakpoint, as the deck uses the term?
16A designer forces a long essay into a twelve-column modular grid, chopping paragraphs into small boxes. Which pitfall is this?